Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Water-to-Water Heat Pump WH-90-H-B-2S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
LCD Interface Check
Alarm and Fault Inspection
Are there any alarms or faults reported on the LCD Interface?
Describe any alarms or faults found
Rectify any problems found with alarms or faults
Post-Inspection
Ensure all alarms are cleared after rectification
Confirm that the system is operating normally after rectification
1 Monthly Strainers Inspection
Inspection of Strainers
Check for the presence of strainers
Inspect strainers for any debris or blockage
Cleaning of Strainers
Clean the strainers if debris or blockage is found
Reinspect strainers after cleaning
Heat Exchanger Maintenance
Initial Assessment
Is there a performance degradation not explained by a refrigeration circuit problem or low loop flow rate?
Heat Exchanger Flushing
Disconnect the affected loop
Flush heat exchanger with a lime removing solution
Post Maintenance Check
Is the system performance restored?
Documentation
Describe any issues encountered during maintenance
LCD Interface Board Replacement
Power Off
Turn the power off to the unit
Remove Old Display Board
Remove the display board cable connector from the control board
Slice each of the display board standoff heads off using a sharp utility knife
Pull the display board from the unit
Remove the display board cable connector from the back of the display board
Install New Display Board
Place a new display board standoff into each of the four holes in the cabinet
1 Yearly Compressor Inspection
Compressor Contactor Inspection
Inspect the compressor contactor for the following issues
Is replacement of the contactor necessary?
Is tightening of wires necessary?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX