Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Water-to-Water Heat Pump W-90-W-P-2S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
LCD Interface Board Replacement
Power Management
Turn the power off to the unit
Remove Old Display Board
Remove the display board cable connector from the control board
Slice each of the display board standoff heads off using a sharp utility knife
Pull the display board from the unit
Remove the display board cable connector from the back of the display board
Install New Display Board
Place a new display board standoff into each of the four holes in the cabinet
Heat Exchanger Maintenance
Initial Assessment
Is there a performance degradation not explained by refrigeration circuit problem or low loop flow rate?
Heat Exchanger Flushing
Disconnect the affected loop
Flush heat exchanger with a lime removing solution
System Type Verification
Select the system type
Performance Check
Is the system performance reduced for warm water open loop systems?
LCD Interface Check
Alarm and Fault Inspection
Are there any alarms or faults reported on the LCD Interface or PC App?
Rectify the problem if alarms or faults are found
Control Board Replacement
Turn the power off to the unit
Take a picture of the control board and connectors for reference
Remove all green terminal strips from the control board
Remove the red six pin display board connector from the left side of the control board
Remove all connectors from the top of the control board
Remove the control board from its standoffs
Remove any remaining standoffs
Remove the new control board from the static bag
Place cut off standoffs from the old board into the new board
1 Yearly Compressor Inspection
Compressor Contactor Inspection
Inspect contactor for issues
Is replacement of contactor necessary?
Is tightening of wires necessary?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX