Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Water-to-Water Heat Pump W-55-H
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Coaxial Heat Exchanger Maintenance
Coaxial Heat Exchanger Flushing Procedure - Open Loop
Isolation and Initial Setup
Isolate the heat exchanger by closing the valves in the IN and OUT ports to the heat exchanger.
Blow out the heat exchanger into a clean 5 gallon bucket using compressed air.
Makeshift Pump System Setup
Is a purge cart available?
If a purge cart is not available, use a 5 gallon plastic bucket, a circulator and some plastic piping to create a makeshift pump system. Connect the inlet and outlet to the heat exchanger ports.
Flushing with RYDLYME
Place 2 gallons of RYDLYME or similar in the purge cart (or bucket).
1 Yearly Compressor Contactor Maintenance
Inspection
Inspect for pitted points on the contactor
Inspect for burned points on the contactor
Replacement
Is replacement of contactor necessary?
Replace contactor if necessary
Post Maintenance
Clean the work area
Technician's signature
Control Board Replacement
Turn the power off to the unit
Take a picture of the control board and connectors for reference
Remove all green terminal strips on the left side, the right side and the bottom of the control board
Remove the red six pin display board connector from the left side of the control board
Remove all connectors from the top of the control board
Remove the control board from its four corner standoffs
Remove any remaining standoffs if present
Carefully remove the new control board from the static bag
Place any cut off standoffs from the old board into the same locations on the new board
LCD Interface Maintenance
Initial Inspection
Is the heat pump problem suspected?
Alarm and Fault Check
Are alarms reported through a BACnet system?
Check for alarms and faults on the LCD Interface or PC App
Describe any alarms or faults found
Problem Rectification
Were any alarms or faults found?
Describe the rectification actions taken
LCD Interface Board Replacement
Turn the power off to the unit
Remove the display board cable connector from the control board
Slice each of the display board standoff heads off
Pull the display board from the unit
Remove the display board cable connector from the back of the display board
Place a new display board standoff into each of the four holes in the cabinet
Remove the new display board from the static bag it was shipped in
Connect one end of the display board cable to the back of the display board
Place the display board in position and align the four standoffs into the four holes of the board
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX