

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Water-to-Water Heat Pump W-65-H
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Control Board Replacement
Turn the power off to the unit
Take a picture of the control board and connectors for reference
Remove all green terminal strips from the control board
Remove the red six pin display board connector from the left side of the control board
Remove all connectors from the top of the control board
Remove the control board from its standoffs
Remove any remaining standoffs
Install the new control board
Remove the new control board from the static bag
LCD Interface Maintenance
Initial Inspection
Is the LCD Interface or PC App accessible?
Alarm and Fault Check
Are there any alarms or faults reported?
Describe any alarms or faults found
Rectify any problems if alarms are found
Post Maintenance
Verify that all alarms and faults have been cleared
Is the system operating normally after maintenance?
1 Yearly Compressor Contactor Maintenance
Inspection
Inspect contactor points for pitting or burning
Are the contactor points in good condition?
Replacement
Replace contactor points if necessary
Post Maintenance
Clean the work area
Technician's signature
Coaxial Heat Exchanger Maintenance
Coaxial Heat Exchanger Flushing Procedure - Open Loop
Isolation and Preparation
Isolate the heat exchanger by closing the valves in the IN and OUT ports to the heat exchanger.
Blow out the heat exchanger into a clean 5 gallon bucket using compressed air.
Is a purge cart available?
Makeshift Pump System Setup
Use a 5 gallon plastic bucket, a circulator, and some plastic piping to create a makeshift pump system if a purge cart is not available.
Connect the inlet and outlet to the heat exchanger ports.
Flushing with RYDLYME
LCD Interface Board Replacement
Power Off
Turn the power off to the unit
Remove Old Display Board
Remove the display board cable connector from the control board
Slice each of the display board standoff heads off using a sharp utility knife
Pull the display board from the unit
Remove the display board cable connector from the back of the display board
Install New Display Board
Place a new display board standoff into each of the four holes in the cabinet
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













