MaintainX Asset Hub logo
EnterprisePricing
Maritime Geothermal

Maritime Geothermal Water-to-Water Heat Pump WH-55-H

Need answers fast?
Explore the manual using AI.

Maritime Geothermal Water-to-Water Heat Pump WH-55-H
Maritime Geothermal Water-to-Water Heat Pump WH-55-H

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Maritime Geothermal Water-to-Water Heat Pump WH-55-H

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Maritime Geothermal Water-to-Water Heat Pump WH-55-H

Maritime Geothermal Water-to-Water Heat Pump WH-55-H

Create an account to install this asset package.

Maintenance Plans for Maritime Geothermal Water-to-Water Heat Pump Model WH-55-H

Integrate maintenance plans directly into your work orders in MaintainX.

LCD Interface Maintenance

Check mark

Initial Inspection

Check mark

Is the heat pump problem suspected?

Check mark

Alarm and Fault Check

Check mark

Are alarms reported through a BACnet system?

Check mark

Check for alarms and faults on the LCD Interface or PC App

Check mark

Describe any alarms or faults found

Check mark

Problem Rectification

Check mark

Were any alarms or faults found?

Check mark

Describe the rectification actions taken

Run this procedureArrow right

Coaxial Heat Exchanger Maintenance

Check mark

Coaxial Heat Exchanger Flushing Procedure - Open Loop

Check mark

Isolate the heat exchanger by closing the valves in the IN and OUT ports to the heat exchanger.

Check mark

Blow out the heat exchanger into a clean 5 gallon bucket using compressed air.

Check mark

Is a purge cart available?

Check mark

Place 2 gallons of RYDLYME or similar in the purge cart (or bucket).

Check mark

Circulate the fluid through the heat exchanger for at least 2 hours (3 hours recommended).

Check mark

Disconnect the purge system and dispose of the solution.

Check mark

Connect fresh water and a drain to the heat exchanger ports and flush the exchanger for several minutes.

Check mark

Return the plumbing to its original configuration and open the IN and OUT valves.

Run this procedureArrow right

Compressor Replacement

Check mark

Initial Steps

Check mark

Pump down the unit as per the Pumpdown Procedure

Check mark

Was there a compressor burn out (motor failure)?

Check mark

Disconnection and Replacement

Check mark

Disconnect piping

Check mark

Replace the compressor

Check mark

Replace the liquid line filter-dryer

Check mark

Ensure nitrogen is flowing through the system during brazing procedures

Check mark

Vacuuming

Run this procedureArrow right

LCD Interface Board Replacement

Check mark

Power Off

Check mark

Turn the power off to the unit

Check mark

Remove Old Display Board

Check mark

Remove the display board cable connector from the control board

Check mark

Slice each of the display board standoff heads off using a sharp utility knife

Check mark

Pull the display board from the unit

Check mark

Remove the display board cable connector from the back of the display board

Check mark

Install New Display Board

Check mark

Place a new display board standoff into each of the four holes in the cabinet

Run this procedureArrow right

1 Yearly Compressor Contactor Maintenance

Check mark

Inspection

Check mark

Inspect contactor for pitted points

Check mark

Inspect contactor for burned points

Check mark

Replacement

Check mark

Is replacement of contactor necessary?

Check mark

Replace contactor if necessary

Check mark

Post Maintenance

Check mark

Document the maintenance performed

Check mark

Technician's signature

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Maritime Geothermal

Explore Other Assets