MaintainX Asset Hub logo
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Compressor R132

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Compressor R132
Ingersoll Rand Compressor R132

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Compressor R132

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Compressor R132

Ingersoll Rand Compressor R132

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Compressor Model R132

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Compressor Check

Check mark

Check - Connections and hoses for leaks

Check mark

Check Coolant level

Check mark

A coolant level sight glass is located on the side of the separator tank. While the compressor is running under load, coolant should always be visible in the sight glass. The normal position is half way. The compressor should be running for at least 40 seconds for this check.

Check mark

Stop the compressor, ensure the sump pressure is 0 psig and ensure the coolant is still visible in the sight glass.

Check mark

Adding Coolant

Check mark

Run the compressor for a minimum of 40 seconds. The coolant level should be visible in the sight glass. If not:

Check mark

1. Stop the compressor.

Check mark

2. Isolate the compressor from the external air system.

Check mark

3. Press the emergency stop to vent the separator tank and airend.

Run this procedureArrow right

Air Cooled Cooling System Cleaning

Check mark

Air compressor operating temperatures will be higher than normal if the external passages between the fins of the cooler cores become restricted with foreign material. Regular cleaning of the cooler surfaces will support the reliable operation of the air compressor system, improve the life of the compressor coolant and improve overall compressor efficiency.

Check mark

When performed frequently as determined by site conditions and airborne contamination, more significant cleaning or replacement may not be necessary.

Check mark

1. Stop the compressor.

Check mark

2. Isolate the compressor from the system.

Check mark

3. Press the emergency stop to vent the separator tank and airend.

Check mark

Fixed speed compressors can take more than two minutes to fully de-pressurize once stopped.

Check mark

4. Ensure that the main power disconnect switch is locked off and tagged.

Check mark

NOTICE

Check mark

For any required lifting of air compressor parts or required tools, always use the proper certified lifting equipment, and employ sound working principles.

Run this procedureArrow right

6000 Hourly Compressor Maintenance

Check mark

Replace Food-grade Lubricant (Ultra FG)

Check mark

Replace Separator element (if using Food-grade Lubricant)

Check mark

With the compressor running on load, check the separator differential pressure via the controller. It will be necessary to change the element if the differential pressure equals zero or exceeds 1 bar (15 psig).

Check mark

Changing Separator Element

Check mark

For R30-37, separator cartridges change procedure is as follows,

Check mark

1. Stop the machine, electrically isolate and vent all trapped pressure.

Check mark

2. Loosen separator cartridges with the correct tool.

Check mark

3. Remove the cartridges from the housing; place in a sealed bag and dispose of safely.

Check mark

4. Clean the mating faces of the housing.

Run this procedureArrow right

16000 Hourly / 4 Yearly Coolant Hoses Replacement

Check mark

Replace Coolant hoses

Check mark

The flexible hoses that carry coolant through the cooling system may become brittle with age and will require replacement. Replace them as needed or every four years.

Check mark

1. Depending on the location of the hose, it may contain compressor coolant. It is recommended to drain the coolant into a clean container. Cover the container to prevent contamination. If the coolant is contaminated, replace with new coolant.

Check mark

2. Remove the hose.

Check mark

3. Install the new hose and refill the compressor with coolant.

Check mark

4. Start the compressor, check for leaks and check coolant level. Refill as necessary.

Run this procedureArrow right

1 Daily No Loss Drain Trap Maintenance

Check mark

Warning: This maintenance check requires trained personnel with PPE!

Check mark

Is the no loss drain trap checked daily?

Check mark

Press the test button on the drain and listen for condensate / air passing through the drain. Is it functioning correctly?

Check mark

If the drain is clogged, what action was taken?

Check mark

Sign off on the no loss drain trap maintenance

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets