

The Genie Articulated Boom Lift S-120 is a versatile aerial work platform designed for efficient lifting and maneuverability in various industrial applications. Known for its robust construction and advanced safety features, this boom lift ensures reliable performance and operator safety on job sites. Ideal for maintenance and construction tasks, it provides exceptional reach and stability.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Genie Articulated Boom Lift S-120 S-120
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Jib Rotate Bearing Maintenance
- Perform Maintenance – Jib Rotate Bearing - SX-150 and SX-180
Periodic inspection of jib bearing wear is essential to safe machine operation, good machine performance and service life. Continued use of a worn jib bearing could create an unsafe operating condition, resulting in death or serious injury and component damage
Note: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface
1. Check the Jib Rotator Fastener torque
2. Using a star pattern, confirm that each jib rotator outer mounting bolt is torqued in sequence to specification. Repeat the procedure for the inner mounting bolts
Jib boom rotate bearing bolts: 200 ft-Ibs/ 271 Nm
Grease the Jib Rotator
3. While rotating the jib, pump grease into each bearing lubricating grease fitting until fresh grease is visible at the outer seal
4. While rotating the jib, pump grease into the worm gear grease fitting until fresh grease is visible at one sealing lip or bearing cap
3 Monthly Emergency Power System Test
- Test the Emergency Power System (excludes ALC-600 and ALC-1000 Models)
1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls
2. At the ground controls, break the security tie and lift the emergency power switch cover (if equipped)
3. Simultaneously hold the emergency power switch on and operate each boom function through a partial cycle
• Result: All boom functions operate
4. Close the emergency power switch cover and secure the cover with a security tie (if equipped)
5 Turn the key switch to platform controls
6. At the platform controls, break the security tie and lift the emergency power switch cover (if equipped). 7. Press down on the foot switch and simultaneously hold the emergency power switch on and operate each boom function through a partial cycle
• Result: All boom functions operate
2000 Hourly Turntable Rotation Gear Backlash Check
- Check the Turntable Rotation Gear Backlash - ALC1000 Models
Properly adjusted turntable rotation gear backlash is essential for good machine performance and service life. Improperly adjusted turntable rotation gear backlash will cause the machine to perform poorly and continued use will cause component damage. The turntable rotation drive hubs are mounted on an adjustable plate on the swing chassis behind the fixed side cover at the ground controls side of the machine
This procedure does not apply to the Z-60/80 models
Note: Perform this procedure with the machine fully stowed and the counterweight at the square end of the machine
Note: Perform this procedure with the machine on a firm, level surface that is free of obstructions
1. Rotate the turntable until the boom is centered between the circle end wheels
2. Apply approximately 20 lbs / 89 N of side force to the platform, moving the platform to one side as far as it will go
3. Using a feeler gauge, measure the gap between the swing hub pinion gear and the turntable rotation bearing at the center tooth on one of the drive hubs. The gap should be measured on one side of the pinion gear on the center tooth
Note: The pinion gear can be accessed on the outside of the chassis under the pinion gear guard
Initial 50 Hours Engine Maintenance
Ford Models:
- Oil, coolant, fuel, exhaust and vacuum
hoses - check for leaks, damage or deterioration
- Electrical wiring - check for chafing or damage
Kubota Models:
- Engine oil - replace
- Oil filter - replace
GM .998L:
- Cylinder head bolts - torque (40.5 ft-lbs / 55 Nm)
2000 Hourly Free-Wheel Configuration Check
- Check the Free-wheel Configuration
Proper use of the free-wheel configuration is essential to safe machine operation. The free-wheel configuration is used primarily for towing. A machine configured to free-wheel without operator knowledge may cause death or serious injury and property damage
Models with 2 wheel steer will be referenced with Non-steer and steer wheels
Models with 4 wheel steer will be referenced with Circle-end and Square-end wheels
WARNING!
Collision hazard. Select a work site that is firm and level
NOTICE:
Component damage hazard. If the machine must be towed, do not exceed 2 mph / 3.2 km/h
Non-steer or Circle-end wheels:
Access the parts list for your equipment in MaintainX.
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













