Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Outdoor Unit Heat Pump Air Conditioner RXS71GVMV
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Coil / Thermistor Removal
Warning: Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Pull out the electronic expansion valve coil.
Remove the screw and remove the four way valve coil.
Cooling only models have no four way valve coil.
Pull out the outdoor heat exchanger thermistor.
Be careful not to lose the clip for the thermistor.
Slightly open the sound blanket (outer).
Remove the sound blanket (top upper).
The design of the sound blankets varies depending on the model.
Compressor Removal
Safety Precautions
Wait for 10 minutes after turning off all power supplies before starting disassembly.
Ensure no burns occur from heated pipes and parts.
Ventilate the room if refrigerant gas leaks.
Prepare wet cloth to extinguish fire if refrigerant oil catches fire.
Environmental and Safety Cautions
Do not discharge refrigerant gas into the atmosphere.
Collect all refrigerant gas.
Restore piping by non-oxidation brazing.
Electrical Box Removal
Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.
Screw Removal
Remove the screw on the stop valve mounting plate.
Remove the screw on the partition plate (1).
Remove the 2 screws to detach the earth / ground wires.
Connector Disconnection
Disconnect the connector [S70] (fan motor).
Release the fan motor lead wire from the 5 hooks.
Disconnect the connectors of the front side: [S20] (electronic expansion valve coil), [S40] (overload protector), [S80] (four way valve coil), [S90] (thermistors).
Outer Panel Removal
Preliminary Safety Measures
Ensure all power supplies are turned off and wait for 10 minutes before starting disassembly
Remove the Suction Grille
Unfasten the 5 hooks
Remove the suction grille
Remove the Top Panel
Remove the 8 screws
Lift the top panel and remove it
Remove the Right Side Panel
Sound Blanket Removal
Warning: Wait for 10 minutes or more after turning off all power supplies before disassembling work.
Open the sound blanket (outer).
Remove the sound blanket (top upper).
Remove the screw and slightly push the partition plate (1) to the left for easy work.
Remove the sound blanket (outer).
Design Variations
The design of the sound blankets varies depending on the model.
The sound blanket is fragile. Carefully pass the discharge pipe through it.
Since the piping ports are torn easily, remove the sound blanket carefully.
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX