MaintainX, an Autodesk company
EnterprisePricing
Daikin

Daikin Outdoor Unit Cooling Only Air Conditioner RMKS112LV1A

Need answers fast?
Explore the manual using AI.

Daikin Outdoor Unit Cooling Only Air Conditioner RMKS112LV1A
Daikin Outdoor Unit Cooling Only Air Conditioner RMKS112LV1A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Outdoor Unit Cooling Only Air Conditioner RMKS112LV1A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Outdoor Unit Cooling Only Air Conditioner RMKS112LV1A

Daikin Outdoor Unit Cooling Only Air Conditioner RMKS112LV1A

Create an account to install this asset package.

Maintenance Plans for Daikin Outdoor Unit Cooling Only Air Conditioner Model RMKS112LV1A

Integrate maintenance plans directly into your work orders in MaintainX.

Outdoor Fan / Fan Motor Removal

Check mark

Warning: Wait for 10 minutes after turning off all power supplies before disassembling work.

Check mark

Outdoor Fan Removal

Check mark

Remove the nuts and remove the outdoor fans.

Check mark

Fan Motor Preparation

Check mark

Cut the clamp.

Check mark

Pull out the connector while supporting the fan motor and pushing the engaging hook, without pulling its lead wires.

Check mark

Remove the lower screws first.

Check mark

Fan Motor Removal

Check mark

Remove the 4 screws and remove the fan motor.

Run this procedureArrow right

Four Way Valve Removal

Check mark

Safety Precautions

Check mark

Wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Ensure pipes and parts heated by the gas brazing machine are cool to avoid burns.

Check mark

Is the room ventilated in case of refrigerant gas leakage?

Check mark

Collect all refrigerant gas to prevent atmospheric discharge.

Check mark

Cautions for Restoration

Check mark

Restore the piping by non-oxidation brazing.

Check mark

Wrap the four way valve with wet cloth and provide water to keep it below 120°C (248°F).

Check mark

Preparation

Run this procedureArrow right

PCB / Electrical Component Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Remove the terminal cover (The U.S. models only)

Check mark

Remove the screw on the terminal cover (upper) and open the terminal cover (upper).

Check mark

Remove the screw and open the terminal cover (lower).

Check mark

Remove the 2 screws and remove the terminal covers.

Check mark

Remove the PCBs and electrical components

Check mark

Remove the 2 screws of the terminal mounting plate. (Except the U.S. models.)

Check mark

Remove the screw above the electrical component assembly.

Check mark

Unfasten the clamp from the terminal mounting plate.

Run this procedureArrow right

Electronic Expansion Valve / Peripheral Equipment Removal

Check mark

Safety Precautions

Check mark

Wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Ensure proper ventilation if refrigerant gas leaks during work.

Check mark

Collect all refrigerant gas to prevent atmospheric discharge.

Check mark

Cautions for Restoration

Check mark

Restore the piping by non-oxidation brazing.

Check mark

Wrap the four way valve with wet cloth and provide water to prevent overheating.

Check mark

Preparation

Check mark

Ensure the refrigerant gas is empty in the circuit.

Run this procedureArrow right

Thermistor Removal

Check mark

Safety Precaution

Check mark

Ensure all power supplies are turned off

Check mark

Wait for 10 minutes or more before starting disassembly

Check mark

Removal of Thermistors

Check mark

Remove the outdoor temperature thermistor (R1T)

Check mark

Pull out the discharge pipe thermistor (R2T)

Check mark

Pull out the suction pipe thermistors (R3T) and (R5T)

Check mark

Pull out the subcooling thermistor (R6T) and the liquid pipe thermistor (R7T)

Check mark

Pull out the outdoor heat exchanger thermistor (R4T)

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets