MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Indoor Unit Cooling Only Air Conditioner FTKS25JVMG

Need answers fast?
Explore the manual using AI.

Daikin Indoor Unit Cooling Only Air Conditioner FTKS25JVMG
Daikin Indoor Unit Cooling Only Air Conditioner FTKS25JVMG

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Indoor Unit Cooling Only Air Conditioner FTKS25JVMG

Daikin Indoor Unit Cooling Only Air Conditioner FTKS25JVMG

Create an account to install this asset package.

Maintenance Plans for Daikin Indoor Unit Cooling Only Air Conditioner Model FTKS25JVMG

Integrate maintenance plans directly into your work orders in MaintainX.

Front Panel Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Open the front panel over the position where it stops.

Check mark

Slide the left rotary shaft to the right and release it.

Check mark

Remove the right rotary shaft in the same way.

Check mark

When reassembling the front panel, fit the right and left rotary shafts one by one into the grooves and fully push them into position.

Check mark

Sign off on the front panel removal

Run this procedureArrow right

Air Filter Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

1. Remove the air filters.

Check mark

The air filter is not marked for difference between the right and left sides.

Check mark

Insert the air filter with the “FRONT” mark faced up.

Check mark

The air filter can be set easily by inserting it along the guides.

Check mark

Be sure to insert the hooks (at 2 lower positions) when mounting the air filter.

Check mark

1) Open the front panel.

Check mark

2) Pull out the air filter downward and remove it.

Check mark

2. Remove the Titanium apatite photocatalytic airpurifying filters.

Run this procedureArrow right

Fan Motor Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Release the fan motor lead wires from the hooks.

Check mark

Remove the screw of the fan rotor.

Check mark

Remove the 2 screws of the fan motor fixing plate.

Check mark

Unfasten the hook (a) of the fan motor fixing plate.

Check mark

Unfasten the hook (b) and remove the fan motor fixing plate.

Check mark

Remove the fan motor.

Check mark

Sign off on the fan motor removal.

Run this procedureArrow right

PCB Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Shield plate removed

Check mark

Indoor heat exchanger thermistor released

Check mark

Terminal board removed

Check mark

Signal receiver unit removed

Check mark

Signal receiver PCB removed

Check mark

INTELLIGENT EYE sensor PCB removed

Check mark

Display PCB removed

Check mark

Control PCB removed

Run this procedureArrow right

Horizontal Blade / Vertical Blade ASSY Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

1. Remove the horizontal blades.

Check mark

When reassembling, mount the large horizontal blade to the upper position and the small horizontal blade to the lower position.

Check mark

Do not install them in the wrong place.

Check mark

1) Unfasten the center shaft while bending the horizontal blade (upper) slightly.

Check mark

2) Unfasten the left shaft.

Check mark

3) Unfasten the right shaft.

Check mark

4) Remove the horizontal blade (lower) in the same way.

Check mark

Installation procedure

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets