MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Outdoor Unit Air Conditioner RXTQ36TBVJUB

Need answers fast?
Explore the manual using AI.

Daikin Outdoor Unit Air Conditioner RXTQ36TBVJUB
Daikin Outdoor Unit Air Conditioner RXTQ36TBVJUB

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Outdoor Unit Air Conditioner RXTQ36TBVJUB

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Outdoor Unit Air Conditioner RXTQ36TBVJUB

Daikin Outdoor Unit Air Conditioner RXTQ36TBVJUB

Create an account to install this asset package.

Maintenance Plans for Daikin Outdoor Unit Air Conditioner Model RXTQ36TBVJUB

Integrate maintenance plans directly into your work orders in MaintainX.

Refrigerant Shortage Check

Check mark

Warning: This check requires trained personnel with PPE!

Check mark

Enter the superheating degree of suction gas

Check mark

Has the compressor discharge gas temperature become higher?

Check mark

Has the electronic expansion valve turned open?

Check mark

Has the low pressure dropped causing the unit not to demonstrate cooling/heating capacity?

Check mark

Sign off on the refrigerant shortage check

Run this procedureArrow right

Refrigerant Overcharge Check

Check mark

Warning: This check requires trained personnel with PPE!

Check mark

Enter the high pressure reading

Check mark

Is overload control conducted causing insufficient cooling capacity?

Check mark

Enter the superheating degree of suction gas

Check mark

Is the compressor lower in discharge pipe temperature despite of pressure loads?

Check mark

Enter the subcooling degree of condensate

Check mark

In heating, is the temperature of discharge air through the subcooled section lower?

Check mark

Sign off on the refrigerant overcharge check

Run this procedureArrow right

Broken Wire Check

Check mark

Warning: Ensure the power supply to all equipment is turned OFF before starting the procedure.

Check mark

Power supply to all equipment turned OFF?

Check mark

Short circuit between the indoor-outdoor unit terminal F1 and F2 in the outdoor unit.

Check mark

Short circuit between the indoor-outdoor unit terminal F1 and F2 in the outdoor unit done?

Check mark

Conduct continuity checks between the transmission wirings F1 and F2 of the indoor unit a that is farthest from the outdoor unit using a multimeter.

Check mark

Continuity check done?

Check mark

Is there continuity between the said transmission wirings?

Check mark

If there is no continuity, the transmission wiring may have broken wires. With the indoor-outdoor unit terminal of the outdoor unit short circuited, identify the place with continuity in the transmission wiring of the indoor unit b, transmission wiring of the indoor unit c, and transmission wiring of the indoor unit d in the order described.

Check mark

Identify the place with continuity in the transmission wiring of the indoor unit b, transmission wiring of the indoor unit c, and transmission wiring of the indoor unit d.

Run this procedureArrow right

Power Transistor Check

Check mark

Warning: Power OFF before starting the procedure

Check mark

Remove all the wiring connected to the PCB where power transistors are mounted on

Check mark

Prepare a multimeter. An analog system is recommended, but a digital system with diode check function is also usable

Check mark

Wait for 10 minutes after power OFF before starting the measurement

Check mark

Choose the type of multimeter used

Check mark

Measurement in the resistance value mode in the range of multiplying 1 kΩ (for analog multimeter)

Check mark

Measurement in the diode check mode (for digital multimeter)

Check mark

Sign off on the power transistor check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets