MaintainX, an Autodesk company
EnterprisePricing
Bradford White

Bradford White Water Heater RG2PV75H6X19

Need answers fast?
Explore the manual using AI.

Bradford White Water Heater RG2PV75H6X19
Bradford White Water Heater RG2PV75H6X19

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Bradford White Water Heater RG2PV75H6X19

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bradford White Water Heater RG2PV75H6X19

Bradford White Water Heater RG2PV75H6X19

Create an account to install this asset package.

Maintenance Plans for Bradford White Water Heater Model RG2PV75H6X19

Integrate maintenance plans directly into your work orders in MaintainX.

Anode Inspection

Check mark

Anode Inspection & Replacement

Check mark

Take necessary precautions to prevent personal injury

Check mark

Position on/off switch of gas control valve to the 'OFF' position and unplug water heater from wall outlet

Check mark

Turn off cold water supply to water heater

Check mark

Connect hose to drain valve of water heater and route to an open drain

Check mark

Open a nearby hot water faucet to vent water heater for draining

Check mark

Open drain valve of water heater and allow water heater to drain to a point below the outlet connection nipple

Check mark

Disconnect outlet nipple from plumbing system

Check mark

Remove outlet nipple/anode from the water heater using an appropriate tool such as a pipe wrench

Run this procedureArrow right

115 VAC Circuit Testing

Check mark

115 VAC Circuit Trace

Check mark

Verify 115 VAC and proper polarity at wall outlet

Check mark

With unit plugged in and control power switch in the “ON” position verify LED status

Run this procedureArrow right

6 Monthly Burner Inspection

Check mark

Burner Inspection

Check mark

Check for causes of unstable pilot flame

Check mark

Inspect pilot flame stability

Check mark

Inspect main burner flame color and stability

Check mark

Check for debris accumulation on main burner

Check mark

Is the main burner free from debris?

Run this procedureArrow right

Pressure Switch Testing

Check mark

Pressure Switch Testing

Check mark

Position power switch on gas control to the “OFF” position.

Check mark

Remove the three screws from control access cover on blower assembly and remove cover.

Check mark

Remove pressure switch from blower housing

Check mark

Note any warnings or precautions taken during the procedure.

Check mark

To resume operation, follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

Run this procedureArrow right

Flame Arrestor Cleaning

Check mark

ScreenLok® Flame Arrestor Cleaning

Check mark

Is the model equipped with the ScreenLok® Flame Arrestor?

Check mark

Position Gas Control power switch to the “OFF” position.

Check mark

Remove outer door.

Check mark

Remove outer jacket door and inner door per service procedure XIII on page 39.

Check mark

Disconnect main burner feedline (3/4” wrench), pilot tube (7/16” wrench) and igniter/flame sensor wire from gas control and remove burner assembly from combustion chamber.

Check mark

Clean ScreenLok® Flame Arrestor using stiff brush, compressed air and/or shop vacuum to remove any scale or other debris accumulation.

Check mark

Using a soft brush, clear jacket openings from any dirt, dust, restrictions or other obstructions.

Check mark

Remove any debris from burner assembly per PROCEDURE I and reinstall burner assembly into combustion chamber.

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bradford White

Explore Other Assets