MaintainX, an Autodesk company
EnterprisePricing
Bradford White

Bradford White Water Heater RG1PV50S6N19

Need answers fast?
Explore the manual using AI.

Bradford White Water Heater RG1PV50S6N19
Bradford White Water Heater RG1PV50S6N19

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Bradford White Water Heater RG1PV50S6N19

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bradford White Water Heater RG1PV50S6N19

Bradford White Water Heater RG1PV50S6N19

Create an account to install this asset package.

Maintenance Plans for Bradford White Water Heater Model RG1PV50S6N19

Integrate maintenance plans directly into your work orders in MaintainX.

Blower Testing

Check mark

Blower Testing

Check mark

Position gas control power switch to 'ON' position and adjust control to call for heat

Check mark

Remove the three screws from control access cover on blower assembly using a Phillip’s screw driver

Check mark

Refer to photo 7 for guidance on removing the cover

Run this procedureArrow right

6 Monthly Burner Inspection

Check mark

Burner Inspection

Check mark

Inspect the pilot burner for proper operation and stability of the flame.

Check mark

Identify causes for an unstable pilot flame, if any

Check mark

Check that the main burner lights smoothly from the pilot and burns with a blue flame with minimal yellow tips.

Check mark

Is the main burner free from any debris accumulation?

Run this procedureArrow right

Gas Control Maintenance

Check mark

ECO (Energy Cut Out)

Check mark

Reset the gas control after an error code (4)

Check mark

Gas Control Disassembly/Reassembly

Check mark

Set the gas control to the 'OFF' position

Check mark

Turn off gas supply to water heater

Check mark

Disconnect gas supply line from gas control

Check mark

Disconnect igniter/flame sensor wire

Check mark

Remove outer jacket door

Check mark

Remove gas control cover screw

Run this procedureArrow right

Pressure Switch Testing

Check mark

Pressure Switch Testing

Check mark

Position power switch on gas control to the “OFF” position.

Check mark

Remove the three screws from control access cover on blower assembly and remove cover.

Check mark

Remove pressure switch from blower housing

Check mark

Note any warnings or potential hazards encountered during the procedure.

Check mark

To resume operation, follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

Run this procedureArrow right

Safety Circuit Voltage Testing

Check mark

Safety Circuit Voltage Trace

Check mark

Remove three screws from control access cover on blower

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bradford White

Explore Other Assets