Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bradford White Water Heater RG1PV40S10N19
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Switch Testing
Pressure Switch Testing
Position power switch on gas control to the “OFF” position.
Remove the three screws from control access cover on blower assembly and remove cover.
Remove pressure switch from blower housing
Use caution to avoid personal injury due to 115 volt potential exposure.
To resume operation, follow the instructions on the lighting instruction label or the installation and operation manual.
Blower Temperature Switch Testing
Blower Temperature Switch Testing
Position power switch on gas control to the “OFF” position
Remove the three screws from control access cover on blower and remove cover
Locate blower temperature switch
115 VAC Circuit Testing
115 VAC Circuit Trace
Verify 115 VAC and proper polarity at wall outlet
With unit plugged in and control power switch in the “ON” position verify LED status
Gas Control Maintenance
Gas Control Removal From Water Heater
Position the gas control power switch to the “OFF” position and unplug heater from wall outlet.
Drain the heater to a point below the gas control level.
Turn off the gas supply to the water heater and disconnect gas piping from the gas control.
Disconnect wire harnesses from the gas control.
Remove the outer jacket burner access door.
Right side inner door removal
Remove (2) hex drive screws from RIGHT side inner door.
Remove (2) hex drive screws from FLANGE SECTION of inner door.
Blower Testing
Blower Testing
Position gas control power switch to 'ON' position and adjust control to call for heat.
Remove the three screws from control access cover on blower assembly using a Phillip’s screw driver.
Refer to photo 7 for guidance on removing the cover.
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX