

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bradford White Water Heater RG2PV50H6N19
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Diptube Inspection
Diptube Inspection & Replacement
Ensure necessary precautions are taken to prevent personal injury due to hot components and stored water.
Position on/off switch of gas control valve to 'OFF' position and unplug water heater from wall outlet.
Turn off cold water supply to water heater.
Disconnect inlet nipple from plumbing system.
Remove inlet nipple/dip tube from the water heater using an appropriate tool such as a pipe wrench, ensuring no damage to pipe threads.
Visually inspect inlet nipple/dip tube for cracks and blockages. Ensure Hydrojet slots are open and free of blockage.
Is the inlet nipple/dip tube free of damage such as cracks, restriction due to deformation, or unintentional holes?
Reinstall inlet nipple/dip tube into water heater using pipe dope on the nipple’s threads.
115 VAC Circuit Testing
115 VAC Circuit Trace
Verify 115 VAC and proper polarity at wall outlet
With unit plugged in and control power switch in the “ON” position verify LED status
Manifold Pressure Testing
Line Pressure
Check the line pressure with the main burner on
Check the line pressure with the main burner off
Manifold Pressure Testing
Set the Gas Control to the 'OFF' position
Remove pressure tap plug and install 1/8” NPT pipe, coupling & pressure tap
Connect manometer to pressure tap
Light the main burner and observe manometer reading
Verify the proper operating range for gas type
Blower Maintenance
Blower Removal
Position gas control power switch to 'OFF' position and adjust control to call for heat.
Unplug blower power cord from wall outlet.
Disconnect vent system from exhaust adapter on top of blower.
Remove exhaust adapter from blower using a blade screwdriver and retain for use on new blower.
Unplug cord sets from blower.
Remove the three blower mounting screws using a 1/4” nut driver.
Remove blower with gasket from water heater.
Blower Installation
6 Monthly Burner Inspection
Burner Inspection
Inspect the pilot burner for proper operation and debris accumulation.
Check if the pilot flame is stable.
Identify causes for an unstable pilot flame, if any.
Ensure the main burner lights smoothly from the pilot.
Verify the main burner burns with a blue flame with minimal yellow tips.
Check the main burner for any debris accumulation.
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













