MaintainX, an Autodesk company
EnterprisePricing
Bradford White

Bradford White Water Heater RG2PV75H6N19

Need answers fast?
Explore the manual using AI.

Bradford White Water Heater RG2PV75H6N19
Bradford White Water Heater RG2PV75H6N19

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Bradford White Water Heater RG2PV75H6N19

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bradford White Water Heater RG2PV75H6N19

Bradford White Water Heater RG2PV75H6N19

Create an account to install this asset package.

Maintenance Plans for Bradford White Water Heater Model RG2PV75H6N19

Integrate maintenance plans directly into your work orders in MaintainX.

Pressure Switch Testing

Check mark

Pressure Switch Testing

Check mark

Position power switch on gas control to the “OFF” position.

Check mark

Remove the three screws from control access cover on blower assembly and remove cover.

Check mark

Remove pressure switch from blower housing

Check mark

Note any warnings or precautions taken during the procedure.

Check mark

To resume operation, follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

Run this procedureArrow right

Blower Testing

Check mark

Blower Testing

Check mark

Ensure safety precautions are followed

Check mark

Position gas control power switch to 'ON' position and adjust control to call for heat

Check mark

Remove the three screws from control access cover on blower assembly using a Phillip’s screw driver

Check mark

Refer to photo 7 for guidance on removing the cover

Run this procedureArrow right

Blower Temperature Switch Maintenance

Check mark

Blower Temperature Switch Replacement

Check mark

Position gas control power switch to the “OFF” position and unplug heater from wall outlet.

Check mark

Remove the three screws from the control access cover on blower and remove cover.

Check mark

Locate blower temperature switch.

Check mark

Disconnect red and yellow wire leads from switch.

Check mark

Snip the retaining lug from the blower housing to allow removal of temperature switch.

Check mark

Remove switch from blower housing.

Check mark

Install new switch ensuring it is properly seated in mounting area.

Check mark

Reconnect red and yellow wires to new switch.

Run this procedureArrow right

Flame Arrestor Cleaning

Check mark

ScreenLok® Flame Arrestor Cleaning

Check mark

Is the model equipped with the ScreenLok® Flame Arrestor?

Check mark

Position Gas Control power switch to the “OFF” position.

Check mark

Remove outer door.

Check mark

Remove outer jacket door and inner door per service procedure XIII on page 39.

Check mark

Disconnect main burner feedline (3/4” wrench), pilot tube (7/16” wrench) and igniter/flame sensor wire from gas control and remove burner assembly from combustion chamber.

Check mark

Clean ScreenLok® Flame Arrestor using stiff brush, compressed air and/or shop vacuum to remove any scale or other debris accumulation.

Check mark

Using a soft brush, clear jacket openings from any dirt, dust, restrictions or other obstructions.

Check mark

Remove any debris from burner assembly per PROCEDURE I and reinstall burner assembly into combustion chamber.

Run this procedureArrow right

Diptube Inspection

Check mark

Diptube Inspection & Replacement

Check mark

Ensure necessary precautions are taken to prevent personal injury due to hot components and stored water.

Check mark

Position on/off switch of gas control valve to 'OFF' position and unplug water heater from wall outlet.

Check mark

Turn off cold water supply to water heater.

Check mark

Disconnect inlet nipple from plumbing system.

Check mark

Remove inlet nipple/dip tube from the water heater using an appropriate tool such as a pipe wrench, ensuring no damage to pipe threads.

Check mark

Visually inspect inlet nipple/dip tube for cracks and blockages. Ensure hydrojet slots are open and free of blockage.

Check mark

Is the inlet nipple/dip tube free of damage such as cracks, restriction due to deformation, or unintentional holes?

Check mark

Reinstall inlet nipple/dip tube into water heater using pipe dope on the nipple’s threads.

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bradford White

Explore Other Assets