

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bradford White Water Heater RG2PV50T6N19
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pilot Inspection
Pilot Inspection, Testing and Replacement
Position gas control power switch to the “OFF” position and unplug heater from wall outlet.
Turn off gas supply to water heater.
Remove outer jacket door and inner door per service procedure XIII on page 39.
Disconnect pilot tubing nut (7/16” wrench) and feedline nut (3/4” wrench) from gas control.
Disconnect igniter/flame sense wire from gas control.
Remove burner assembly from combustion chamber.
Remove pilot assembly from feedline (1/4” nut driver).
Visually inspect igniter/flame sense wire for damage. Replace pilot if damage is found.
Gas Control Maintenance
ECO (Energy Cut Out)
Reset the gas control after an error code (4)
Turn the gas control knob to the “LOW” position
Wait a minimum of 5 minutes before relighting
Follow the instructions on the lighting instruction label or manual
Gas Control Disassembly/Reassembly
Set the gas control to the “OFF” position
Turn off gas supply to water heater
Disconnect gas supply line from gas control
Burner Cleaning
Burner Cleaning
Position gas control power switch to the “OFF” position and unplug heater from wall outlet.
Turn off gas supply to water heater.
Remove outer jacket door and inner door per service procedure XIII on page 39.
Disconnect pilot tube (7/16” wrench) and feedline (3/4” wrench) from gas control.
Disconnect igniter/flame sensor wire from gas control.
Remove burner assembly from combustion chamber.
Thoroughly inspect burner surface area and burner port area and remove any loose debris.
Unscrew burner from main burner orifice.
Pressure Switch Testing
Pressure Switch Testing
Position power switch on gas control to the “OFF” position.
Remove the three screws from control access cover on blower assembly and remove cover.
Remove pressure switch from blower housing
Note any warnings or potential hazards encountered during the procedure.
To resume operation, follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.
Safety Circuit Voltage Testing
Safety Circuit Voltage Trace
Ensure safety precautions are in place
Remove three screws from control access cover on blower using a Phillips screwdriver
Remove control access cover from blower
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













