Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bitzer Compressor 8GC-50.2(Y)
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Compressor Lubrication
Initial Oil Level Check
Check and record the oil level in the sight glass
Is the oil level within the acceptable range (¼ to ¾)?
Oil Pressure Check
Measure the oil pressure using a gauge connected to the Schrader valves on the oil pump
Is the differential oil pressure within permissible values (1.4 to 3.5 bar)?
Is the inlet pressure (suction side of oil pump) at least 0.4 bar?
Automatic Monitoring System
Has the differential oil pressure switch cut out?
Compressor Check
Operating Data and Oil Supply
Check operating data as per chapter 5.6
Verify oil supply as per chapter 5.6
Protection Devices and Monitoring Parts
Inspect protection devices and monitoring parts
Electrical and Mechanical Checks
Check electrical cable connections for tight fitting
Verify tightening torques as per KW-100
Refrigerant and Data Protocol
10000 Hourly / 3 Yearly Oil Change
Initial Inspection
Is the plant a field installation or near operating limits?
Oil Change Procedure
Replace the oil after 10,000 to 12,000 operating hours or every 3 years
Clean the oil filter
Clean the magnetic plug
Handling and Safety Precautions
Avoid air admission into the plant and oil can
Use only originally closed oil drums
Initial 100 Hours Oil Change
Preparation
Ensure the plant is turned off and cooled down
Gather necessary tools and materials
Verify oil types available
Oil Change Process
Drain the old oil from the system
Clean the oil filter
Clean the magnetic plug
Refill with new oil
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX