Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Allied Air Enterprises Warm Air Gas Furnace 95G1UH070BE12
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Gas Furnace Preliminary and Seasonal Inspection
Preliminary and Seasonal Checks
Inspect electrical wiring for loose connections and tighten as required.
Check voltage at disconnect switch.
Is the voltage within the range listed on the nameplate?
Inspect condition of condensate traps and drain assembly.
Disassemble and clean condensate traps and drain assembly seasonally.
Gas Furnace Gas Piping Leak Testing
Pre-Test Safety Measures
Ensure main shut-off valve is labeled and accessible
Ensure main power to unit is labeled and accessible
Pressure Testing Preparation
Disconnect and isolate the gas valve
Ensure gas valve is not subjected to more than 0.5 psig (14" W.C.)
Leak Testing Procedure
Check piping connections for gas leaks using preferred means
Ensure no kitchen detergents are used for leak detection
Gas Furnace Proper Ground and Voltage Inspection
Proper Ground and Voltage Inspection
Safety Precautions
Ensure black iron pipe is installed at the gas valve and extends outside the furnace cabinet if a flexible gas connector is required or allowed.
Voltage Measurement
Measure the AC voltage between Line Neutral (spade terminals) and 'C' terminal (low voltage terminal block) on the integrated control.
Is the voltage between Line Neutral and 'C' within the acceptable range as per Table 21?
Measure the AC voltage from Line Hot to Line Neutral (spade terminals) on the integrated control.
Is the voltage from Line Hot to Line Neutral within the range of 97 to 132 VAC?
Post-Inspection Actions
Electrical Inspection
Electrical Inspection
Safety Precautions
Ensure only copper wire is used with this product
Verify wiring and circuit breaker are properly sized according to Product Specifications and unit rating plate
Wiring Inspection
Check all wiring for loose connections
Voltage and Current Check
Enter the voltage at the furnace (furnace operating)
Is the voltage within the correct range?
Condensate Hose Screens Inspection
Turn off power to the unit
Remove hoses from cold end header box
Twist and pull screens to remove
Inspect screens for blockage
Rinse screens with tap water if needed
Reinstall screens
Reconnect hoses
Turn on power to unit
Access the parts list for your equipment in MaintainX.
External Filter Rack 1 pack (16 x 25)
1.841018
External Filter Rack 10 pack (16 x 25)
1.841039
Natural to LP Kit 1-Stage - 90
11K50
Natural to LP Kit High Altitude 1-Stage
11K45
Natural to LP Kit 1-Stage - 90 Low Input [030K BTUH]
13X57
External Filter Rack 1 pack (16 x 25)
1.841018
External Filter Rack 10 pack (16 x 25)
1.841039
Natural to LP Kit 1-Stage - 90
11K50
Natural to LP Kit High Altitude 1-Stage
11K45
Natural to LP Kit 1-Stage - 90 Low Input [030K BTUH]
13X57
External Filter Rack 1 pack (16 x 25)
1.841018
External Filter Rack 10 pack (16 x 25)
1.841039
Natural to LP Kit 1-Stage - 90
11K50
Natural to LP Kit High Altitude 1-Stage
11K45
Natural to LP Kit 1-Stage - 90 Low Input [030K BTUH]
13X57
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX