

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Air Science Ductless Fume Hoods P5-48S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Unit Cleaning
Safety Precautions
Ensure the power to the system has been removed
Remove the power lead
Verify the cabinet is safe to work on
Cleaning the Unit
Wipe down the unit with only soapy water
Filters Change
Safety Precautions
Ensure all personnel are aware of potential hazards
Provide necessary protective clothing and equipment
Filter Removal
Is the filter used with hydrocarbon solvents?
Remove the filter in the laboratory if used with hydrocarbon solvents
Does the filter contain dangerous materials such as asbestos dust or radioactive chemicals?
Use operator protection including a respirator if the filter contains dangerous materials
Filter Disposal
Main Carbon / Hepa Filter Removal
Preparation
Disconnect the power supply
Remove the front cover to gain access to the filter
Filter Removal
Loosen the filter clamps from inside the bottom enclosure
Lift the filter slightly to break the seal
Withdraw the filter
Place the filter in a plastic bag and seal it for disposal
New Filter Installation
Ductless Fume Hoods Check
WARNING! Ensure power is removed
Pre-Filters
Check condition of pre-filters
Replace pre-filters if required
Lights
Check the light diffuser is clean before switching the system on
Check that the light is working
Air Flows
Record inflow air velocity at the working aperture
Access the parts list for your equipment in MaintainX.
Power Switch 120 Volt Units
WRG32F2FBGLN
Indicator Light 120 Volt Units
C0480AABA2
Speed Control 120 Volt Units
706-123S
Lamp Holder 120 Volt Units
DL-80
Light Bulb 120 Volt Units
EDX0-14
Power Switch 120 Volt Units
WRG32F2FBGLN
Indicator Light 120 Volt Units
C0480AABA2
Speed Control 120 Volt Units
706-123S
Lamp Holder 120 Volt Units
DL-80
Light Bulb 120 Volt Units
EDX0-14
Power Switch 120 Volt Units
WRG32F2FBGLN
Indicator Light 120 Volt Units
C0480AABA2
Speed Control 120 Volt Units
706-123S
Lamp Holder 120 Volt Units
DL-80
Light Bulb 120 Volt Units
EDX0-14
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













