MaintainX Asset Hub logo
EnterprisePricing
Agilent

Agilent Multisampler G7137A

Need answers fast?
Explore the manual using AI.

Agilent Multisampler G7137A
Agilent Multisampler G7137A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Agilent Multisampler G7137A

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Agilent Multisampler G7137A

Agilent Multisampler G7137A

Create an account to install this asset package.

Maintenance Plans for Agilent Multisampler Model G7137A

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Needle Assembly Removal

Check mark

For bio-inert modules use bio-inert parts only! For biocompatible modules use bio / biocompatible parts only! Do not mix with bio-inert parts.

Check mark

When: The needle is visibly damaged. Leaks or blockages are observed. The limit for the needle interaction EMF counter is exceeded. The needle needs to be replaced as part of the yearly maintenance.

Check mark

Prerequesites: Finish any pending acquisition job. Stop the flow at the pump and remove the solvent lines from the eluent bottles to avoid spilling solvent. Close the shutoff valves at the pump if available.

Check mark

WARNING: Risk of injury by uncovered needle An uncovered needle is a risk of harm to the operator. Do not open the safety lock of the needle assembly Be careful working at the z-robot. Wear safety goggles, when removing the needle assembly.

Check mark

WARNING: Toxic, flammable and hazardous solvents, samples and reagents The handling of solvents, samples and reagents can hold health and safety risks. When working with these substances observe appropriate safety procedures (for example by wearing goggles, safety gloves and protective clothing) as described in the material handling and safety data sheet supplied by the vendor, and follow good laboratory practice.

Check mark

NOTE It is recommended to always exchange the needle assembly and the needle seat at the same time to prevent premature leakage.

Check mark

In the Agilent Lab Advisor software select Service & Diagnostics > Maintenance Positions > Change Needle, Loop and Seat , click Start and wait until the needle assembly is in maintenance position. OR: In the Local Controller start the maintenance mode and select Change Needle, Loop and Seat function.

Check mark

Open the front door.

Check mark

Lock the needle in the safety position.

Run this procedureArrow right

1 Yearly Peristaltic Pump Cartridge Replacement

Check mark

WARNING: When opening capillary or tube fittings solvents may leak out. The handling of toxic and hazardous solvents and reagents can hold health risks.

Check mark

NOTE: The peristaltic pump cartridge is a replaceable unit. The tubing inside the pump is not replaceable.

Check mark

Open the front door.

Check mark

Press the two clips on the front of the peristaltic pump cartridge.

Check mark

Pull the cartridge forward off the motor shaft.

Check mark

Disconnect the tubing coupler leading to the wash port and the tubing coupler coming from the solvent bottle.

Check mark

Push the new cartridge onto the motor shaft until the clips click into place.

Check mark

Connect the wash port tubing to the upper tubing of the new cartridge (use sand paper to get a good grip on the tubing).

Check mark

Connect the inlet filter of the solvent bottle again. Use the syringe to draw enough solvent for completely filling of the peristaltic pump tubing before continuing to prime the peristaltic pump.

Run this procedureArrow right

1 Yearly Rotor Seal Replacement

Check mark

For bio-inert modules use bio-inert parts only! For biocompatible modules use bio / biocompatible parts only! Do not mix with bio-inert parts.

Check mark

When: Injection volume reproducibility problems are observed, leaks or blockages are observed, the limit for the rotor seal EMF counter is exceeded, the rotor seal needs to be replaced as part of the yearly maintenance.

Check mark

CAUTION: Reduced life time of the injection valve. Component cleanliness is crucial for the life time of the injection valve. Replace the rotor seal in a clean environment.

Check mark

NOTE: Please bear in mind that depending on which valve you have installed the images may slightly differ from the actual item.

Check mark

Open the front door.

Check mark

Remove all capillaries from the injection valve with a 1/4 inch wrench.

Check mark

NOTE: Remember the correct plumbing. Check the drawing on the side cover of the hydraulic box for correct plumbing.

Check mark

Use a 9/64 inch hex driver to unscrew the two socket screws which hold the stator head in place.

Check mark

CAUTION: Damage to the stator head. The polished sealing surface of the stator head contains six ports that access handling can easily damage. Avoid touching the polished surface of the stator head. Never place the polished surface on a hard surface.

Run this procedureArrow right

Drawer Replacement

Check mark

Before you start the new drawer installation you have to remove the lower drawer (2H drawer = default configuration) from the Sample Hotel.

Check mark

For best cooling performance the 2H drawer must be installed in the lowest position.

Check mark

More detailed video information is available on the Agilent Information Center.

Check mark

Open the drawer.

Check mark

Pull the drawer completely out.

Check mark

Unlatch the drawer: Use a screwdriver to press the clamping lever lightly to the left.

Check mark

Remove the drawer from the rail guide.

Check mark

The drawer is now out of the hotel.

Check mark

Grab in the recession below the dummy drawer front panel and lift the left side.

Run this procedureArrow right

Flush Head Seal Replacement

Check mark

Warning: For bio-inert modules use bio-inert parts only!

Check mark

When: The flush head is leaking.

Check mark

Prerequesites: Cleaning tissue, Appropriate solvent like isopropanol or methanol

Check mark

In the Local Controller start the maintenance mode and select Service Position.

Check mark

In the Agilent Lab Advisor software select Service & Diagnostics in the system screen (Tools) > Maintenance Positions > Change Metering Device , click start and wait until the metering device is in maintenance position.

Check mark

Open the front door.

Check mark

Remove capillaries and valves from the flush head.

Check mark

Press and turn the Flush Head a quarter left (bayonet fitting) and detach the metering device from the actuator.

Check mark

Pull the flush head away from the hydraulic box

Run this procedureArrow right

Parts for Agilent Multisampler G7137A

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

2 Ml Vials With Barcode

5182-0716-ID

2-Position/6-Port Injection Valve Bio 1300 Bar (G7137A)

5067-6739

2-Position/6-Port Injection Valve Bio-Inert 600 Bar For Bio Inert Solution

5067-4263

2-Position/6-Port Injection Valve (Vici) 1300 Bar (G7167B)

5067-4232

2-Position/6-Port Rc Injection Valve 800 Bar (G7167A)

5067-6698

2 Ml Vials With Barcode

5182-0716-ID

2-Position/6-Port Injection Valve Bio 1300 Bar (G7137A)

5067-6739

2-Position/6-Port Injection Valve Bio-Inert 600 Bar For Bio Inert Solution

5067-4263

2-Position/6-Port Injection Valve (Vici) 1300 Bar (G7167B)

5067-4232

2-Position/6-Port Rc Injection Valve 800 Bar (G7167A)

5067-6698

2 Ml Vials With Barcode

5182-0716-ID

2-Position/6-Port Injection Valve Bio 1300 Bar (G7137A)

5067-6739

2-Position/6-Port Injection Valve Bio-Inert 600 Bar For Bio Inert Solution

5067-4263

2-Position/6-Port Injection Valve (Vici) 1300 Bar (G7167B)

5067-4232

2-Position/6-Port Rc Injection Valve 800 Bar (G7167A)

5067-6698

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Agilent

Explore Other Assets