Manual for Advanced Distributor Products Unit Heater SEP−250-S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Advanced Distributor Products Unit Heater SEP−250-S

Advanced Distributor Products Unit Heater SEP−250-S

Create an account to install this asset package.

Maintenance Plans for Advanced Distributor Products Unit Heater Model SEP−250-S

Integrate maintenance plans directly into your work orders in MaintainX.

Flue And Chimney Check

Check mark

Vent and Vent Connector Inspection

Check mark

Check all vent and vent connector joints for tightness

Check mark

Are all connections sealed?

Check mark

Are there any blockages in the vents or connectors?

Check mark

Post Inspection

Check mark

Clean the inspection area

Check mark

Dispose of any debris or waste found during inspection

Run this procedureArrow right

Electrical Inspection

Check mark

Check all wiring for loose connections

Check mark

Enter the voltage at the unit (unit operating)

Check mark

Record the amperage draw

Check mark

Post inspection tasks

Check mark

Ensure all tools are removed from the inspection area

Check mark

Is the inspection area clean and free of debris?

Run this procedureArrow right

Heating Sequence Maintenance

Check mark

Initial Heating Sequence

Check mark

Verify that the combustion air inducer starts immediately when the thermostat calls for heat.

Check mark

Ensure the combustion air pressure switch proves inducer operation before allowing power to the ignition controller.

Check mark

Ignition Phase

Check mark

Confirm that after a prepurge of approximately 30 seconds, the spark ignition is energized and the solenoid valves open in the gas valve.

Check mark

Verify step opening valve operation for models SEP 230, 250, 300, 345, and 400

Check mark

Combustion Process

Check mark

Check that the spark ignites the gas and the ignition sensor proves the flame.

Check mark

Is the combustion process continuing without interruption?

Run this procedureArrow right

Burner Maintenance

Check mark

Burner Flame Examination

Check mark

Examine burner flames for proper appearance during the heating season

Check mark

Pre-Heating Season Inspection

Check mark

Examine burners for any deposits or blockage

Check mark

Burner Cleaning Procedure

Check mark

Turn off both electrical and gas supplies to unit

Check mark

Disconnect gas supply piping, high tension and sensor leads

Check mark

Remove gas manifold

Check mark

Remove burner tray

Run this procedureArrow right

Gas Pressure Adjustment

Check mark

Gas Line Pressure Check

Check mark

Enter the gas line pressure with unit firing at maximum rate

Check mark

Select the type of gas used

Check mark

Is the gas line pressure at least 5'' (127mm) w.c for natural gas or 11'' (279mm) w.c for LP/propane gas?

Check mark

Regulator Pressure Adjustment

Check mark

Enter the current regulator pressure

Check mark

Adjust manifold pressure to the value specified on the unit rating plate

Check mark

Refer to figures 8, 9, and 10 for gas pressure adjustment screw location

Check mark

Gas Type Conversion

Run this procedureArrow right

Parts for Advanced Distributor Products Unit Heater SEP−250-S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Hanging Bracket Kit

100001381

LPG/Propane Kit

165296403

Hanging Bracket Kit

100001381

LPG/Propane Kit

165296403

Hanging Bracket Kit

100001381

LPG/Propane Kit

165296403

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Advanced Distributor Products

Explore Other Assets