

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advanced Distributor Products Unit Heater SEP−145-A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Combustion Air Inducer Check
Preparation
Disconnect power supply
Inspection and Cleaning
Inspect the combustion air inducer for any visible damage or wear
Use a small brush to clean the inducer wheel
Post-Inspection
Is the combustion air inducer clean and free of debris?
Reconnect power supply
Burner Maintenance
Burner Flame Examination
Examine burner flames for proper appearance during the heating season
Pre-Heating Season Inspection
Examine burners for any deposits or blockage
Burner Cleaning Procedure
Turn off both electrical and gas supplies to unit
Disconnect gas supply piping, high tension and sensor leads
Remove gas manifold
Remove burner tray
Flue And Chimney Check
Vent and Vent Connector Inspection
Check all vent and vent connector joints for tightness
Are all connections sealed?
Ensure there are no blockages in the vent and vent connectors
Post Inspection
Clean the inspection area
Dispose of any debris or waste found during inspection
Electrical Inspection
Check all wiring for loose connections
Voltage and Amperage Check
Enter the voltage at the unit
Is the voltage within the correct range?
Enter the amperage draw
Is the amperage draw within the acceptable limits?
Post Inspection
Describe any issues found during the inspection
Inspector's signature
Safety Shut-Off Valve Inspection
Initial Setup
Turn off the manual gas valve
Set the thermostat to call for heat
System Operation Check
Did the system begin normal sequence of operation?
Wait for approximately 30 seconds (pre purge period)
Is the LED fast flashing indicating the gas valve is powered?
Gas Valve Cycling
Count the number of times the gas valve closes and reopens (should be 3 times)
Access the parts list for your equipment in MaintainX.
LPG/Propane Kit
165295202
4” Straight Pipe (Length = 12”)
66809302
4” Straight Pipe (Length = 36”)
66809303
LPG/Propane Kit
165295202
4” Straight Pipe (Length = 12”)
66809302
4” Straight Pipe (Length = 36”)
66809303
LPG/Propane Kit
165295202
4” Straight Pipe (Length = 12”)
66809302
4” Straight Pipe (Length = 36”)
66809303
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













