MaintainX Asset Hub logo
EnterprisePricing
Advanced Distributor Products

Advanced Distributor Products Unit Heater SEP−230-S

Need answers fast?
Explore the manual using AI.

Advanced Distributor Products Unit Heater SEP−230-S
Advanced Distributor Products Unit Heater SEP−230-S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Advanced Distributor Products Unit Heater SEP−230-S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Advanced Distributor Products Unit Heater SEP−230-S

Advanced Distributor Products Unit Heater SEP−230-S

Create an account to install this asset package.

Maintenance Plans for Advanced Distributor Products Unit Heater Model SEP−230-S

Integrate maintenance plans directly into your work orders in MaintainX.

Safety Shut-Off Valve Inspection

Check mark

Turn off the manual gas valve

Check mark

Set the thermostat to call for heat

Check mark

System begins normal sequence of operation

Check mark

Observe LED for fast flash indicating the gas valve is powered after approximately 30 seconds

Check mark

Verify the gas valve closes after 10 seconds and repeats two additional times before locking out

Check mark

Check for two flashes on the LED indicating the gas valve is locked out

Check mark

De-energize the thermostat call for heat to restart the system

Check mark

Follow the operating instructions under 'Unit Start-Up'

Run this procedureArrow right

Electrical Inspection

Check mark

Check all wiring for loose connections

Check mark

Enter the voltage at the unit (unit operating)

Check mark

Record the amperage draw

Check mark

Post inspection tasks

Check mark

Ensure all tools are removed from the inspection area

Check mark

Is the inspection area clean and free of debris?

Run this procedureArrow right

Heating Sequence Maintenance

Check mark

Initial Checks

Check mark

Verify thermostat calls for heat

Check mark

Check if combustion air inducer starts immediately

Check mark

Combustion Air Pressure Switch Verification

Check mark

Verify combustion air pressure switch proves inducer operation

Check mark

Ensure no adjustment is necessary for the factory-set switch

Check mark

Ignition and Gas Valve Operation

Check mark

Record prepurge duration in seconds

Check mark

Check if spark ignition is energized and solenoid valves open

Run this procedureArrow right

Burner Maintenance

Check mark

Burner Flame Examination

Check mark

Examine burner flames for proper appearance during the heating season

Check mark

Pre-Heating Season Inspection

Check mark

Examine burners for any deposits or blockage

Check mark

Burner Cleaning Procedure

Check mark

Turn off both electrical and gas supplies to unit

Check mark

Disconnect gas supply piping, high tension and sensor leads

Check mark

Remove gas manifold and burner tray

Check mark

Clean burners as necessary

Run this procedureArrow right

Gas Pressure Adjustment

Check mark

Gas Line Pressure Check

Check mark

Measure gas line pressure with unit firing at maximum rate

Check mark

Is the gas line pressure within the required range?

Check mark

Regulator Pressure Adjustment

Check mark

Check regulator pressure

Check mark

Refer to figures 8, 9, and 10 for gas pressure adjustment screw location

Check mark

Was the manifold pressure adjusted to the specified values?

Check mark

Conversion Procedure

Check mark

Verify if a natural gas to LP/propane gas changeover kit is required

Run this procedureArrow right

Parts for Advanced Distributor Products Unit Heater SEP−230-S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Hanging Bracket Kit

100001381

LPG/Propane Kit

165295203

5” Straight Pipe (Length = 6”)

66809401

Hanging Bracket Kit

100001381

LPG/Propane Kit

165295203

5” Straight Pipe (Length = 6”)

66809401

Hanging Bracket Kit

100001381

LPG/Propane Kit

165295203

5” Straight Pipe (Length = 6”)

66809401

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX