

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advanced Distributor Products Unit Heater SEP−115-A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Flue Passageway And Flue Box Maintenance
Preparation
Turn off both electrical and gas supply to unit
Disconnect combustion air inducer wiring
Flue Box Removal and Cleaning
Remove screws securing flue box to unit
Remove flue box
Is it necessary to remove blower assembly from flue box?
Clean flue box with wire brush
Flue Baffles Cleaning
2 Yearly Motor Bearing Lubrication
Combustion Air Inducer Motor Bearings
Verify that combustion air inducer motor bearings are pre-lubricated and sealed
Fan Motor Bearings
Check for manufacturer's lubrication instructions on each motor
Re-lubricate fan motor bearings if no manufacturer's instructions are provided
Apply a few drops of SAE No 10 non-detergent oil to motors with oiling ports
Combustion Air Inducer Check
Preparation
Disconnect power supply
Inspection and Cleaning
Inspect the combustion air inducer for any visible damage or wear
Use a small brush to clean the inducer wheel
Post-Inspection
Is the combustion air inducer clean and free of debris?
Heating Sequence Maintenance
Initial Checks
Verify thermostat calls for heat
Check if combustion air inducer starts immediately
Combustion Air Pressure Switch
Ensure combustion air pressure switch proves inducer operation
Confirm no adjustment is necessary for the factory-set switch
Ignition and Gas Valve Operation
Record prepurge duration in seconds
Verify spark ignition is energized
Flue And Chimney Check
Vent and Vent Connector Inspection
Check all vent and vent connector joints for tightness
Are all connections sealed?
Are there any blockages in the vents?
Post Inspection
Clean the inspection area
Dispose of any debris or waste found during inspection
Access the parts list for your equipment in MaintainX.
LPG/Propane Kit
165295202
4” Straight Pipe (Length = 6”)
66809301
LPG/Propane Kit
165295202
4” Straight Pipe (Length = 6”)
66809301
LPG/Propane Kit
165295202
4” Straight Pipe (Length = 6”)
66809301
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













