MaintainX Asset Hub logo
EnterprisePricing
Advanced Distributor Products

Advanced Distributor Products Unit Heater SEP−115-S

Need answers fast?
Explore the manual using AI.

Advanced Distributor Products Unit Heater SEP−115-S
Advanced Distributor Products Unit Heater SEP−115-S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Advanced Distributor Products Unit Heater SEP−115-S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Advanced Distributor Products Unit Heater SEP−115-S

Advanced Distributor Products Unit Heater SEP−115-S

Create an account to install this asset package.

Maintenance Plans for Advanced Distributor Products Unit Heater Model SEP−115-S

Integrate maintenance plans directly into your work orders in MaintainX.

Burner Maintenance

Check mark

Burner Flame Examination

Check mark

Examine burner flames for proper appearance during the heating season

Check mark

Pre-Heating Season Inspection

Check mark

Examine burners for any deposits or blockage

Check mark

Burner Cleaning Procedure

Check mark

Turn off both electrical and gas supplies to unit

Check mark

Disconnect gas supply piping, high tension and sensor leads

Check mark

Remove gas manifold

Check mark

Remove burner tray

Run this procedureArrow right

Heating Sequence Maintenance

Check mark

Initial Checks

Check mark

Verify thermostat calls for heat

Check mark

Check if combustion air inducer starts immediately

Check mark

Combustion Air Pressure Switch Verification

Check mark

Ensure combustion air pressure switch proves inducer operation

Check mark

Confirm no adjustment is necessary for the factory-set switch

Check mark

Ignition and Gas Valve Operation

Check mark

Record prepurge duration in seconds

Check mark

Verify spark ignition is energized

Run this procedureArrow right

Safety Shut-Off Valve Inspection

Check mark

Initial Setup

Check mark

Turn off the manual gas valve

Check mark

Set the thermostat to call for heat

Check mark

System Operation Check

Check mark

Did the system begin normal sequence of operation?

Check mark

Enter the duration of the pre purge period in seconds

Check mark

Did the LED fast flash indicating the gas valve is powered?

Check mark

Gas Valve Cycling

Check mark

Enter the number of times steps 4 and 5 repeated before lockout

Run this procedureArrow right

Gas Pressure Adjustment

Check mark

Gas Line Pressure Check

Check mark

Enter the gas line pressure with unit firing at maximum rate

Check mark

Select the type of gas used

Check mark

Is the gas line pressure above the minimum required level?

Check mark

Regulator Pressure Adjustment

Check mark

Enter the current regulator pressure

Check mark

Adjust manifold pressure to the value specified on the unit rating plate

Check mark

Refer to figures 8, 9, and 10 for gas pressure adjustment screw location

Check mark

Gas Type Conversion

Run this procedureArrow right

2 Yearly Motor Bearing Lubrication

Check mark

Combustion Air Inducer Motor Bearings

Check mark

Verify that combustion air inducer motor bearings are pre-lubricated and sealed

Check mark

Fan Motor Bearings

Check mark

Check for manufacturer's lubrication instructions on each motor

Check mark

Re-lubricate fan motor bearings if no manufacturer's instructions are provided

Check mark

Apply a few drops of SAE No 10 non-detergent oil to motors with oiling ports

Run this procedureArrow right

Parts for Advanced Distributor Products Unit Heater SEP−115-S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LPG/Propane Kit

165295202

4” Straight Pipe (Length = 6”)

66809301

LPG/Propane Kit

165295202

4” Straight Pipe (Length = 6”)

66809301

LPG/Propane Kit

165295202

4” Straight Pipe (Length = 6”)

66809301

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Advanced Distributor Products

Explore Other Assets