MaintainX Asset Hub logo
EnterprisePricing
Advanced Distributor Products

Advanced Distributor Products Unit Heater SEP−200-S

Need answers fast?
Explore the manual using AI.

Advanced Distributor Products Unit Heater SEP−200-S
Advanced Distributor Products Unit Heater SEP−200-S

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Advanced Distributor Products Unit Heater SEP−200-S

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Advanced Distributor Products Unit Heater SEP−200-S

Advanced Distributor Products Unit Heater SEP−200-S

Create an account to install this asset package.

Maintenance Plans for Advanced Distributor Products Unit Heater Model SEP−200-S

Integrate maintenance plans directly into your work orders in MaintainX.

Burner Maintenance

Check mark

Burner Flame Examination

Check mark

Examine burner flames for proper appearance during the heating season

Check mark

Pre-Heating Season Inspection

Check mark

Examine burners for any deposits or blockage

Check mark

Burner Cleaning Procedure

Check mark

Turn off both electrical and gas supplies to unit

Check mark

Disconnect gas supply piping, high tension and sensor leads

Check mark

Remove gas manifold

Check mark

Remove burner tray

Run this procedureArrow right

Safety Shut-Off Valve Inspection

Check mark

Initial Setup

Check mark

Turn off the manual gas valve

Check mark

Set the thermostat to call for heat

Check mark

System Operation Check

Check mark

Did the system begin normal sequence of operation?

Check mark

Wait for approximately 30 seconds (pre purge period)

Check mark

Is the LED fast flashing indicating the gas valve is powered?

Check mark

Gas Valve Cycling

Check mark

Count the number of times the gas valve closes and reopens

Run this procedureArrow right

Flue And Chimney Check

Check mark

Vent and Vent Connector Inspection

Check mark

Check all vent and vent connector joints for tightness

Check mark

Are all connections sealed?

Check mark

Are there any blockages in the vents or connectors?

Check mark

Post Inspection

Check mark

Clean the inspection area

Check mark

Dispose of any debris or waste found during inspection

Run this procedureArrow right

Combustion Air Inducer Check

Check mark

Preparation

Check mark

Disconnect power supply

Check mark

Inspection and Cleaning

Check mark

Inspect the combustion air inducer for any visible damage

Check mark

Clean the inducer wheel with a small brush

Check mark

Post-Inspection

Check mark

Is the combustion air inducer free of debris and damage?

Check mark

Reconnect power supply

Run this procedureArrow right

Gas Pressure Adjustment

Check mark

Gas Line Pressure Check

Check mark

Check gas line pressure with unit firing at maximum rate

Check mark

Regulator Pressure Adjustment

Check mark

Check regulator pressure after line pressure has been checked and adjusted

Check mark

Adjust manifold pressure to values specified on the unit rating plate

Check mark

Refer to figures 8, 9, and 10 for gas pressure adjustment screw location

Check mark

Is a natural gas to LP/propane gas changeover kit required for conversion?

Check mark

Refer to installation instructions provided with changeover kit for conversion procedure

Run this procedureArrow right

Parts for Advanced Distributor Products Unit Heater SEP−200-S

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LPG/Propane Kit

165295205

5” 90° Elbow Cat III (Optional)

66809103

LPG/Propane Kit

165295205

5” 90° Elbow Cat III (Optional)

66809103

LPG/Propane Kit

165295205

5” 90° Elbow Cat III (Optional)

66809103

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Advanced Distributor Products

Explore Other Assets