

The ABB Solar Inverter UNO-8.6-TL-OUTD-S-US-A is a high-performance, outdoor solar inverter designed for efficient energy conversion in residential and commercial applications. With advanced monitoring capabilities and robust construction, it ensures reliable operation and maximizes solar energy utilization.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ABB Solar Inverter UNO-8.6-TL-OUTD-S-US-A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Yearly Replacement
Remove and replace the memory back-up battery.;
1 Yearly Maintenance
- Clean the equipment at least annually; in particular, the lower grill on the wiring box through which the air for cooling the heatsink passes and the heatsink itself. If possible, use an extractor or suitable pipe cleaners.
- Once a year or in the event of malfunction, check that the environmental conditions have not changed drastically (exposure to weather conditions); also check that the inverter or PV panels have not been shaded or isolated by foreign bodies.
- Once a year or in the event of malfunction, check the tightness of the cable openings, the fitting of the connectors, and front covers. Loose fittings can allow water seepage into the cabinet which may result in short circuits due to high humidity. - Check internal cooling fan operation (monitor start-up for warning).
- Check DC pressure connectors.
- Check AC pressure connectors.
- Re torque chassis access covers to insure NEMA4X compatibility.
- Check all connections terminals for discoloration or signs of high temp/current.
6 Monthly Maintenance
- Clean the photovoltaic panels every six months, at the change of season or as necessary. The performance of the system depends on the condition of the PV panels. To clean, follow the specifications of the PV panel supplier.
- Check the cooling air path and heatsink for blockages.;
Access the parts list for your equipment in MaintainX.
L-key tool
81510000077
Jumpers for parallel input mode
ZEC.00074
3 Pin Connector
82000005907-G
Mounting Kit
ХАК.P0101.0
8 Pin Connector
82000005908-G
L-key tool
81510000077
Jumpers for parallel input mode
ZEC.00074
3 Pin Connector
82000005907-G
Mounting Kit
ХАК.P0101.0
8 Pin Connector
82000005908-G
L-key tool
81510000077
Jumpers for parallel input mode
ZEC.00074
3 Pin Connector
82000005907-G
Mounting Kit
ХАК.P0101.0
8 Pin Connector
82000005908-G
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













