

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon Packaged Rooftop Unit RN-011
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Bearing Re-lubrication
Preparation
Ensure the bearing is at normal operating temperature but not running
Re-lubrication Process
Rotate the fan shaft by hand
Add grease to purge the seals
Select the grease used for re-lubrication
Energy Recovery Cassettes Routine Maintenance
Polymer Wheel Air Seals Adjustment
Loosen diameter seal adjusting screws
Back seals away from wheel surface
Rotate wheel clockwise until two opposing spokes are hidden behind the bearing support beam
Use a folded piece of paper as a feeler gauge between the wheel surface and diameter seals
Adjust seals towards wheel surface until slight friction on the feeler gauge is detected
Retighten adjusting screws
Recheck clearance with feeler gauge
Energy Recovery Wheel Poutine Maintenance
Safety Precautions
Disconnect electrical power before servicing energy recovery cassette
Keep hands away from bearing support beam when installing or removing segments
Inspection
Inspect the following components
Cleaning
Clean the energy transfer media to maintain optimal performance
Record the frequency of cleaning based on application and air quality
Routine Cleaning Schedule
Brazed Plate Heat Exchanger Cleaning
Preparation
Ensure all necessary equipment and materials are available
Cleaning Process
Select the cleaning acid to use
Pump the cleaning liquid through the exchanger
Rinsing Process
Rinse the heat exchanger with clean water
Select the neutralizing solution to use before the last rinse
Final Steps
1 Yearly Wheel Inspection
Aluminum Wheel Air Seals Inspection
Check the condition of the non-contact sealing on wheel peripheries and brush sealing middle beam
Are the non-contact seals free from being flipped, rolled, or pierced?
Aluminum Wheel Brush Plate Inspection
Inspect the condition of the brushes and their adherence to the wheel matrix surface
Do the brushes require replacement or repositioning?
Adjust the position of the brushes if necessary
Aluminum Wheel Purge Sector Inspection
Check the condition, rigidness, and cleanliness of the purge sectors
Access the parts list for your equipment in MaintainX.
Enviro-Coil Cleaner
V82540
GulfClean TM Coil Cleaner
G074480
GulfClean Salt ReducerTM
G074490
Simple Green
T10701
Enviro-Coil Cleaner
V82540
GulfClean TM Coil Cleaner
G074480
GulfClean Salt ReducerTM
G074490
Simple Green
T10701
Enviro-Coil Cleaner
V82540
GulfClean TM Coil Cleaner
G074480
GulfClean Salt ReducerTM
G074490
Simple Green
T10701
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













