Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon HVAC Unit RN-011-3-0-JA
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Unit Preventive Maintenance
Check all electrical connections
Inspect the unit for any visible damage
Clean the unit thoroughly
Lubricate moving parts
Test the unit's operational functionality
Record any issues found during inspection
Verify that all safety features are operational
Sign off on the maintenance log
Gas Burner Cleaning
Pre-Cleaning Consultation
Has the need for cleaning been confirmed by a qualified service agency?
Has consultation with an AAON Service representative been completed?
Cleaning Procedure
Ensure cleaning is performed by a qualified service agency.
Describe any issues identified during cleaning.
Post-Cleaning Verification
Was the cleaning process completed successfully?
Service technician signature
Brazed Plate Heat Exchanger Cleaning
Preparation
Ensure the following items are ready
Cleaning Process
Pump the cleaning liquid through the exchanger
Set the cleaning solution flow rate
Is the cleaning performed in back-flush mode?
Post-Cleaning Rinse
Rinse the heat exchanger with clean water
Use a solution of 1-2% sodium hydroxide or sodium bicarbonate before the last rinse
DX Cooling Operational Check
Unit Setup
Set unit controls to cooling mode of operation with supply fans on
Fan Inspection
Is the fan operating in the correct direction?
Enter the fan amperage
Enter the fan voltage
Compressor Inspection
Is the compressor operating correctly?
Is the compressor rotating correctly?
1 Monthly E-Coated Coil Cleaning
Safety Precautions
Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts.
Surface Loaded Fibers or Dirt Removal
Remove surface loaded fibers or dirt using one of the following methods
Water Rinse
Ensure surface loaded fibers are completely removed before water rinse.
Verify water temperature is less than 130°F.
Verify water pressure is less than 900 psig.
Perform a low velocity clean water rinse.
Access the parts list for your equipment in MaintainX.
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX