

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon HVAC Unit RN-018-3-0-EJ
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Liquid Sub-Cooling Check
Measure the temperature of the liquid line as it leaves the condenser coil
Read the gauge pressure at the liquid line close to the point where the temperature was taken
Convert the pressure obtained to a saturated temperature using the appropriate refrigerant temperature-pressure chart
Subtract the measured liquid line temperature from the saturated temperature to determine the liquid sub-cooling
Compare calculated sub-cooling to the table below for the appropriate unit type and options
Vent Outlet Maintenance
Vent Outlet Inspection
Check for debris or foreign matter in the vent outlet
Is the vent outlet clear of debris?
Post-Inspection Actions
Remove any debris found in the vent outlet
Was the vent outlet cleaned successfully?
Routine Maintenance Reminder
Check vent outlet each time air filters are changed
1 Monthly Air Filter Maintenance
Safety Precautions
Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts
Filter Inspection and Replacement
Open access door and pull filters straight out to inspect all of the filters
Inspect the following filters
Replace filters with the size indicated on each filter or as shown in the tables
Ensure arrow on the replacement filters points towards the blower
Final Checks
Verify that all filters are properly installed
Brazed Plate Heat Exchanger Cleaning
Preparation
Ensure the following items are ready
Cleaning Process
Pump the cleaning liquid through the exchanger
Ensure the cleaning solution flow rate is at least 1.5 times the normal flow rate
Was the cleaning performed in a back-flush mode?
Post-Cleaning Rinse
Rinse the heat exchanger with clean water
Use a solution of 1-2% sodium hydroxide or sodium bicarbonate before the last rinse to neutralize any remaining acid
Condensate Drain Pan Cleaning
Preparation
Ensure the unit is powered off
Gather necessary cleaning tools and materials
Cleaning Process
Inspect the drain pan for any visible debris or blockage
Remove any debris from the drain pan
Clean the drain pan with an appropriate cleaning solution
Is the drain line clear and unobstructed?
Post-Cleaning Inspection
Access the parts list for your equipment in MaintainX.
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













