Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon HVAC Unit RN-040-3-0-BQ
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Liquid Sub-Cooling Check
Temperature and Pressure Measurement
Measure the temperature of the liquid line as it leaves the condenser coil
Read the gauge pressure at the liquid line close to the point where the temperature was taken
Pressure Conversion and Calculation
Convert the pressure obtained to a saturated temperature using the appropriate refrigerant temperature-pressure chart
Subtract the measured liquid line temperature from the saturated temperature to determine the liquid sub-cooling
Sub-Cooling Comparison
Compare calculated sub-cooling to the table below for the appropriate unit type and options
Gas Heat Exchanger Maintenance
Safety Precautions
Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts.
Check the gas pipe in the unit for leaks before startup.
Removal of Heat Exchanger
Disconnect all wiring on the heat exchanger.
Disconnect flex gas lines and pull out of the way.
Remove screws around the perimeter of the heat exchanger face plate that connect it to the unit. Only the outermost screws should be removed.
Pull the heat exchanger straight back and out of the unit.
Was it necessary to remove some of the control door jambs?
Brazed Plate Heat Exchanger Cleaning
Preparation
Ensure all necessary equipment and materials are available
Cleaning Process
Pump the cleaning liquid through the exchanger
Ensure cleaning solution flow rate is a minimum of 1.5 times the normal flow rate
Post-Cleaning Rinse
Rinse the heat exchanger with clean water
Use a solution of 1-2% sodium hydroxide (NaOH) or sodium bicarbonate (NaHCO) before the last rinse
Finalization
Supply Fan Bearing Lubrication
Preparation
Ensure fan is not running
Is the fan at normal operating temperature?
Lubrication Process
Rotate the fan shaft by hand
Select the grease used for lubrication
Add grease to purge the seals (grams)
Post-Lubrication Check
Was the lubrication process completed without over-lubricating?
1 Yearly Furnace And Main Burner Inspection
Gas Heating Inspection
Pre-Inspection Safety
Ensure the furnace is turned off
Verify that the gas supply is shut off
Flue Product Carrying Areas Inspection
Inspect flue product carrying areas for blockages or damage
Are all flue product carrying areas in good condition?
Main Burner Inspection
Inspect main burners for signs of wear or damage
Access the parts list for your equipment in MaintainX.
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX