

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon HVAC Unit RN-030-3-0-E7
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly E-Coated Coil Cleaning
Safety Precautions
Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts.
Surface Loaded Fibers or Dirt Removal
Remove surface loaded fibers or dirt using one of the following methods
Water Rinse
Ensure surface loaded fibers are completely removed prior to water rinse.
Verify water temperature is less than 130°F.
Verify water pressure is less than 900 psig.
Perform a low velocity clean water rinse.
Microchannel Coil Cleaning
Preparation
Ensure only clean water is available for cleaning
Is the water pressure set to not exceed 140 psi?
Cleaning Procedure
Use pressurized clean water to clean the coils from no closer than 3 inches away
Ensure the water is aimed perpendicular to the coils
Verify nozzle is 6” and 80° to 90° from coil face
Alternative Cleaning Solution
Is a cleaning solution mandatory?
1 Yearly Furnace And Main Burner Inspection
Gas Heating Inspection
Pre-Inspection Safety
Ensure the furnace is turned off before inspection
Verify that the area is well-ventilated
Flue Product Carrying Areas Inspection
Inspect flue product carrying areas for blockages or damage
Are all flue product carrying areas in good condition?
Main Burner Inspection
Inspect main burners for wear and tear
Liquid Sub-Cooling Check
Measure the temperature of the liquid line as it leaves the condenser coil
Read the gauge pressure at the liquid line close to the point where the temperature was taken
Convert the pressure obtained to a saturated temperature using the appropriate refrigerant temperature-pressure chart
Subtract the measured liquid line temperature from the saturated temperature to determine the liquid sub-cooling
Compare calculated sub-cooling to the table below for the appropriate unit type and options
1 Yearly Gas Pipe Leak Inspection
DANGER: LEAK CHECK GAS PIPE
Pre-Inspection Safety Measures
Ensure the gas supply is turned off before inspection
Ventilate the area to disperse any accumulated gas
Leak Inspection
Check all connections for leaks
Were any leaks detected during the inspection?
Post-Inspection Actions
If leaks were detected, were they repaired?
Access the parts list for your equipment in MaintainX.
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













