

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon HVAC Unit RN-015-3-0-EA
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Supply Fan Bearing Lubrication
Preparation
Ensure fan is not running
Is the fan at normal operating temperature?
Lubrication Process
Rotate the fan shaft by hand
Select the grease used for lubrication
Add grease to purge the seals (grams)
Post-Lubrication Check
Was the lubrication process completed without over-lubricating?
Evaporator Superheat Check
Temperature and Pressure Measurement
Measure the temperature of the suction line close to the compressor
Read gauge pressure at the suction line close to the compressor
Temperature Conversion and Calculation
Convert the pressure obtained to a saturated temperature using the appropriate refrigerant temperature-pressure chart
Subtract the saturated temperature from the measured suction line temperature to determine the evaporator superheat
Superheat Comparison
Compare calculated superheat to the table below for the appropriate unit type and options
Microchannel Coil Cleaning
Preparation
Ensure only clean water is available for cleaning
Is the water pressure set to not exceed 140 psi?
Cleaning Process
Position nozzle 6 inches from coil face at an angle of 80° to 90°
Ensure water is aimed perpendicular to the coils from no closer than 3 inches
Is the cleaning solution pH between 5 and 9, if used?
Post-Cleaning Inspection
Check for any visible coil damage
Vent Outlet Maintenance
Pre-Maintenance Check
Ensure appliance is turned off
Vent Outlet Inspection
Inspect the wire screen for debris or foreign matter
Is the wire screen free of debris?
Post-Inspection Actions
Remove any debris or foreign matter from the wire screen
Was the debris successfully removed?
Final Steps
Gas Heat Exchanger Maintenance
Safety Precautions
Shut off all electrical power to the unit to avoid shock hazard or injury from rotating parts.
Check the gas pipe in the unit for leaks before startup.
Removal of Heat Exchanger
Disconnect all wiring on the heat exchanger.
Disconnect flex gas lines and pull out of the way.
Remove screws around the perimeter of the heat exchanger face plate that connect it to the unit. Only the outermost screws should be removed.
Pull the heat exchanger straight back and out of the unit.
Was it necessary to remove some of the control door jambs?
Access the parts list for your equipment in MaintainX.
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
Enviro-Coil Concentrate
H-EC01
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













