

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Aaon Packaged Rooftop Unit RN-030
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heating Coils Inspection
Pre-Inspection Checks
Record the entering air temperature
Is the entering air temperature above 3.3°C (38°F)?
Safety Compliance
Verify compliance with safety requirements
Water Piping Inspection
Check the sealing of water piping entries into the unit
Post-Inspection
Describe any issues found during inspection
1 Yearly Unit Check
Blower Inspection and Cleaning
Inspect blower wheels for excessive dust build up
Is cleaning of blower wheels required due to dust build up?
Clean blower wheels if required
Final Checks
Verify that all components are functioning correctly after cleaning
Technician's signature
DX Coling
Unit Control Settings
Set unit controls to cooling mode of operation with supply fans on
Fan Inspection
Is the fan operating in the correct direction?
Enter the fan amperage
Enter the fan voltage
Compressor Inspection
Is the compressor operating correctly?
Is the compressor rotating correctly?
Brazed Plate Heat Exchanger Cleaning
Preparation
Ensure all necessary equipment and materials are available
Cleaning Process
Select the cleaning acid to use
Pump the cleaning liquid through the exchanger
Is the exchanger frequently cleaned?
Rinsing Process
Rinse the heat exchanger with clean water
Select the neutralizing solution to use before the last rinse
Polymer Wheel Drive Motor and Pulley Replacement
Disconnect power to wheel drive motor
Remove belt from pulley and position temporarily around wheel rim
Loosen set screw in wheel drive pulley using a hex head wrench and remove pulley from motor drive shaft
While supporting weight of drive motor in one hand, loosen and remove (4) mounting bolts
Install replacement motor with hardware kit supplied
Install pulley to dimension as shown and secure set screw to drive shaft
Stretch belt over pulley and engage in groove
Post Replacement Check
Ensure all components are securely fastened
Access the parts list for your equipment in MaintainX.
Enviro-Coil Cleaner
V82540
GulfClean TM Coil Cleaner
G074480
GulfClean Salt ReducerTM
G074490
Simple Green
T10701
Enviro-Coil Cleaner
V82540
GulfClean TM Coil Cleaner
G074480
GulfClean Salt ReducerTM
G074490
Simple Green
T10701
Enviro-Coil Cleaner
V82540
GulfClean TM Coil Cleaner
G074480
GulfClean Salt ReducerTM
G074490
Simple Green
T10701
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













