MaintainX Asset Hub logo
EnterprisePricing
Aaon

Aaon Packaged Rooftop Unit RN-006

Need answers fast?
Explore the manual using AI.

Aaon Packaged Rooftop Unit RN-006
Aaon Packaged Rooftop Unit RN-006

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Aaon Packaged Rooftop Unit RN-006

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Aaon Packaged Rooftop Unit RN-006

Aaon Packaged Rooftop Unit RN-006

Create an account to install this asset package.

Maintenance Plans for Aaon Packaged Rooftop Unit Model RN-006

Integrate maintenance plans directly into your work orders in MaintainX.

Drain Pans Cleaning

Check mark

Preparation

Check mark

Ensure the unit is powered off

Check mark

Wear appropriate personal protective equipment (PPE)

Check mark

Cleaning Process

Check mark

Inspect the drain pans for moisture and microbial growth

Check mark

Remove any debris from the drain pans

Check mark

Clean the drain pans with an appropriate cleaning solution

Check mark

Is the drain line clear and unobstructed?

Check mark

Post-Cleaning Inspection

Run this procedureArrow right

Polymer Wheel Cleaning

Check mark

Preparation

Check mark

Gain access to the energy recovery wheel

Check mark

Remove segments from the wheel

Check mark

Cleaning Process

Check mark

Brush foreign material from the face of the wheel

Check mark

Prepare a 5% solution of non-acid based coil cleaner or alkaline detergent with warm water

Check mark

Wash the segments or small wheels in the prepared solution

Check mark

Ensure solution temperature does not exceed 76.7°C (170°F)

Check mark

Soak segments in the solution until grease and tar deposits are loosened

Run this procedureArrow right

Polymer Wheel Belt Replacement

Check mark

Access and Preparation

Check mark

Obtain access to the pulley side bearing access plate if bearing access plates are provided.

Check mark

Remove two bearing access plate retaining screws and the access plate.

Check mark

Bearing Collar Removal

Check mark

Using hexagonal wrench, loosen set screw in bearing locking collar.

Check mark

Using light hammer and drift, tap collar in the direction of wheel rotation to unlock collar.

Check mark

Remove collar.

Check mark

Bearing Housing Removal

Check mark

Using socket wrench with extension, remove two nuts which secure bearing housing to the bearing support beam.

Run this procedureArrow right

1 Yearly Wheel Inspection

Check mark

Aluminum Wheel Air Seals Inspection

Check mark

Check the condition of the non-contact sealing on wheel peripheries and brush sealing middle beam

Check mark

Are the non-contact seals free from being flipped, rolled, or pierced?

Check mark

Aluminum Wheel Brush Plate Inspection

Check mark

Inspect the condition of the brushes and their adherence to the wheel matrix surface

Check mark

Do the brushes require replacement or repositioning?

Check mark

Adjust the position of the brushes if necessary by unscrewing and repositioning them

Check mark

Aluminum Wheel Purge Sector Inspection

Check mark

Check the condition, rigidness, and cleanliness of the purge sectors

Run this procedureArrow right

Heating Coils Inspection

Check mark

Pre-Inspection Checks

Check mark

Record the entering air temperature

Check mark

Is the entering air temperature above 3.3°C (38°F)?

Check mark

Safety Compliance

Check mark

Verify compliance with safety requirements

Check mark

Water Piping Inspection

Check mark

Check the sealing of water piping entries into the unit

Check mark

Post-Inspection

Check mark

Describe any issues found during inspection

Run this procedureArrow right

Parts for Aaon Packaged Rooftop Unit RN-006

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Enviro-Coil Cleaner

V82540

GulfClean TM Coil Cleaner

G074480

GulfClean Salt ReducerTM

G074490

Simple Green

T10701

Enviro-Coil Cleaner

V82540

GulfClean TM Coil Cleaner

G074480

GulfClean Salt ReducerTM

G074490

Simple Green

T10701

Enviro-Coil Cleaner

V82540

GulfClean TM Coil Cleaner

G074480

GulfClean Salt ReducerTM

G074490

Simple Green

T10701

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Aaon

Explore Other Assets