MaintainX Asset Hub logo
EnterprisePricing
Aaon

Aaon Packaged Rooftop Unit RN-009

Need answers fast?
Explore the manual using AI.

Aaon Packaged Rooftop Unit RN-009
Aaon Packaged Rooftop Unit RN-009

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Aaon Packaged Rooftop Unit RN-009

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Aaon Packaged Rooftop Unit RN-009

Aaon Packaged Rooftop Unit RN-009

Create an account to install this asset package.

Maintenance Plans for Aaon Packaged Rooftop Unit Model RN-009

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Gas Heating Maintenance

Check mark

Pre-Operation Inspection

Check mark

Inspect all flue product carrying areas of the furnace and main burners for continued safe operation.

Check mark

Check the gas pipe in the unit for leaks before operation and startup.

Check mark

Ensure all gas supply lines have been purged of air before turning on the electrical power switch.

Check mark

Startup Procedure

Check mark

Turn the gas valve to the on position.

Check mark

Turn the main electrical power on and set the controls to the heating mode of operation.

Check mark

Did the combustion ventilation motor enable?

Check mark

Did the control automatically supply energy to the igniter and the gas valve after the heating call was made?

Run this procedureArrow right

Belt Segments Replacement

Check mark

Segment Removal

Check mark

Unclip the belt using pliers.

Check mark

Grab the protruding tongue of the segment to remove and twist it to release the segment from the chain.

Check mark

Disconnect the belt in that place.

Check mark

Remove the necessary amount of segments to increase the belt tension.

Check mark

Segment Connection

Check mark

Connect the shortened belt ends by inserting the protruding tongue through the hole of the other half of the belt.

Check mark

Grab the second tongue and insert it through the second hole using pliers, then twist it back to the starting position.

Check mark

Is the belt tension increased?

Run this procedureArrow right

Polymer Wheel Cleaning

Check mark

Preparation

Check mark

Gain access to the energy recovery wheel

Check mark

Remove segments from the wheel

Check mark

Cleaning Process

Check mark

Brush foreign material from the face of the wheel

Check mark

Prepare a 5% solution of non-acid based coil cleaner or alkaline detergent with warm water

Check mark

Wash the segments or small wheels in the prepared solution

Check mark

Ensure solution temperature does not exceed 76.7°C (170°F)

Check mark

Soak segments until grease and tar deposits are loosened

Run this procedureArrow right

Aluminum Wheel Cleaning

Check mark

Preparation

Check mark

Gain access to the aluminum energy recovery wheel

Check mark

Cleaning Methods

Check mark

Remove small foreign materials using one of the following methods

Check mark

Use compressed air at a distance of at least 0.08 m (2 ft) from the wheel

Check mark

Remove the energy recovery wheel from the unit before using water

Check mark

Use water at a distance of at least 0.08 m (2 ft) from the wheel

Check mark

Ensure no detergents are used

Check mark

Ensure temperature is below 25°C (77°F)

Run this procedureArrow right

Heating Coils Inspection

Check mark

Pre-Inspection Safety Check

Check mark

Ensure all safety requirements are in accordance with national and local codes.

Check mark

Verify proper sealing of the water piping entries into the unit.

Check mark

Temperature and Solution Check

Check mark

Record the entering air temperature.

Check mark

Is the air temperature above 3.3°C (38°F)?

Check mark

If air temperature is below 3.3°C (38°F), is a glycol solution being used?

Check mark

Post-Inspection Review

Check mark

Describe any issues found during the inspection.

Run this procedureArrow right

Parts for Aaon Packaged Rooftop Unit RN-009

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Enviro-Coil Cleaner

V82540

GulfClean TM Coil Cleaner

G074480

GulfClean Salt ReducerTM

G074490

Simple Green

T10701

Enviro-Coil Cleaner

V82540

GulfClean TM Coil Cleaner

G074480

GulfClean Salt ReducerTM

G074490

Simple Green

T10701

Enviro-Coil Cleaner

V82540

GulfClean TM Coil Cleaner

G074480

GulfClean Salt ReducerTM

G074490

Simple Green

T10701

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Aaon

Explore Other Assets