Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Pump QS4124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 100 Hours Viking Reducer Oil Change
Oil Type Selection
Select the oil type based on temperature conditions
Oil Quantity Verification
Verify the oil quantity for each Viking reducer size
Oil Change Procedure
Drain the old oil from the Viking reducer
Refill with new lubricant to the proper level
Post-Change Verification
Is the oil filled to the proper level for each reducer size?
Pump Packing Adjustment
Initial Packing Adjustment
Ensure initial packing adjustment is done carefully
Is the packing gland over-tightened?
Post-Adjustment Inspection
Does the inspection reveal the need for packing gland adjustment?
Does the inspection reveal the need for packing replacement?
Further Assistance
Contact Viking Pump® representative for Engineering Service Bulletin ESB-521 regarding repacking pump
Pump Alignment Check
Check Alignment After Mounting
Ensure pump, drive, and motor were properly aligned during assembly
Recheck alignment after pump unit installation
Check pump ports for proper position
Shim or move the pump as required
Ensure piping is not forced to line up with ports
Flexible Coupling Alignment Check
Remove any coupling guards or covers
Check alignment of coupling halves with a straightedge
Initial 200 Hours Ammonia Pump Reservoir Oil Change
Preparation
Ensure the pump is turned off and isolated from the power source
Gather necessary tools and materials, including Light Refrigeration Oil and a container for old oil
Draining Old Oil
Check if the reservoir is empty before starting the procedure
Place a container under the reservoir to catch old oil
Open the drain plug and allow the old oil to completely drain out
Refilling Reservoir
Close the drain plug securely
Pump Cleaning
Initial Cleaning
Remove any visible debris from the pump
Was the exterior of the pump wiped down with a clean cloth?
Detailed Cleaning
Inspect and clean grease fittings
Is there any dirt or grease buildup on the pump components?
Were all accessible parts of the pump cleaned thoroughly?
Post-Cleaning Inspection
Check that all parts are in place and clean
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.