
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Pump H4224A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
500 Hourly Pump Lubrication
Lubrication of Pump Fittings
Apply multi-purpose grease, NLGI # 2, to all lubrication fittings using a hand gun
Ensure all lubrication fittings are properly greased
O-Pro™ Seals Lubrication
Apply lubricating fluid compatible with the process fluid to O-Pro™ seals
Verify O-Pro™ seals are adequately greased
Special Conditions
Check if application involves very high or low temperatures
If yes, ensure appropriate lubrication type is used
Pump Cleaning
Preparation
Ensure the pump is turned off and disconnected from power source
Gather cleaning materials and safety equipment
Cleaning Process
Wipe down the exterior surfaces of the pump
Clean the grease fittings to ensure they are free of dirt
Inspect for any visible damage or wear
Post-Cleaning Inspection
Check that all cleaned parts are in place
Pump Alignment Check
Check Alignment After Mounting
Ensure pump, drive, and motor were properly aligned during assembly
Recheck alignment after pump unit installation
Check pump ports for proper position and squareness
Shim or move the pump as required
Ensure piping is not forced to line up with ports
Flexible Coupling Alignment Check
Remove any coupling guards or covers
Check alignment of coupling halves using a straightedge
1000 Hourly Ammonia Pump Reservoir Oil Change
Preparation
Ensure the pump is turned off and isolated from the power supply
Gather necessary tools and materials, including Light Refrigeration Oil and a container for old oil
Draining Old Oil
Place a container under the reservoir to catch the old oil
Open the drain plug and allow the oil to completely drain out
Refilling Reservoir
Close the drain plug securely
Measure one pint of Light Refrigeration Oil
Initial 200 Hours Ammonia Pump Reservoir Oil Change
Preparation
Ensure the pump is turned off and isolated from the power source
Gather necessary tools and materials, including Light Refrigeration Oil and a container for old oil
Draining Old Oil
Check if the reservoir is empty before starting the procedure
Place a container under the reservoir to catch the old oil
Open the drain plug and allow the old oil to completely drain out
Refilling with New Oil
Measure one pint of Light Refrigeration Oil
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













