
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Pump Q4124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Relief Valve Adjustment
Preparation
Remove valve cap covering the adjusting screw
Loosen locknut on the adjusting screw
Pressure Adjustment
Install a pressure gauge in the discharge line
Adjust the pressure setting by turning the adjusting screw
Close the discharge line beyond the pressure gauge
Limit the operation time to prevent rapid temperature rise
Finalization
Initial 200 Hours Ammonia Pump Reservoir Oil Change
Preparation
Ensure the pump is turned off and isolated from the power source
Gather necessary tools and materials, including Light Refrigeration Oil and a container for old oil
Draining Old Oil
Place a container under the reservoir to catch old oil
Open the drain plug and allow the oil to completely drain out
Check if the reservoir is completely empty
Refilling with New Oil
Close the drain plug securely
1000 Hourly Ammonia Pump Reservoir Oil Change
Preparation
Ensure the pump is turned off and isolated from the power source
Gather necessary tools and materials, including Light Refrigeration Oil and a container for old oil
Draining the Old Oil
Place a container under the reservoir to catch the old oil
Open the drain plug and allow the oil to completely drain out
Check for any metal particles or contaminants in the drained oil
Refilling the Reservoir
Measure one pint of Light Refrigeration Oil
Initial 100 Hours Viking Reducer Oil Change
Oil Type Selection
Select the oil type based on temperature conditions
Oil Quantity Verification
Verify the oil quantity for each Viking reducer size
Oil Change Procedure
Drain the old oil from the Viking reducer
Refill with new lubricant to the proper level
Post Oil Change Check
Is the oil filled to the proper level for the selected size?
Pump Packing Adjustment
Initial Packing Adjustment
Ensure initial packing adjustment is done carefully
Is the packing gland over-tightened?
Post-Adjustment Inspection
Does the inspection reveal the need for packing gland adjustment?
Does the inspection reveal the need for packing replacement?
Contact Viking Pump® representative for Engineering Service Bulletin ESB-521 regarding repacking pump
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













