MaintainX, an Autodesk company
EnterprisePricing
Viking

Viking Pump AL4124A

Need answers fast?
Explore the manual using AI.

Viking Pump AL4124A
Viking Pump AL4124A

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Pump AL4124A

Viking Pump AL4124A

Create an account to install this asset package.

Maintenance Plans for Viking Pump Model AL4124A

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 200 Hours Ammonia Pump Reservoir Oil Change

Check mark

Preparation

Check mark

Ensure the pump is turned off and isolated from the power source.

Check mark

Gather necessary tools and materials, including Light Refrigeration Oil and a container for old oil.

Check mark

Draining Old Oil

Check mark

Place a container under the reservoir to catch the old oil.

Check mark

Open the drain plug and allow the oil to completely drain out.

Check mark

Refilling with New Oil

Check mark

Close the drain plug securely.

Check mark

Measure one pint of Light Refrigeration Oil.

Run this procedureArrow right

Pump Alignment Check

Check mark

Check Alignment After Mounting

Check mark

Ensure pump, drive, and motor were properly aligned during assembly

Check mark

Recheck alignment after pump unit installation

Check mark

Check pump ports for proper position and squareness

Check mark

Shim or move the pump as required

Check mark

Ensure piping is not forced to line up with ports

Check mark

Flexible Coupling Alignment Check

Check mark

Remove any coupling guards or covers

Check mark

Check alignment of coupling halves using a straightedge

Run this procedureArrow right

500 Hourly Pump Lubrication

Check mark

Lubrication of Pump Fittings

Check mark

Apply multi-purpose grease, NLGI # 2, to all lubrication fittings using a hand gun

Check mark

Was the grease applied slowly?

Check mark

O-Pro™ Seals Lubrication

Check mark

Grease O-Pro™ seals with a lubricating fluid compatible with the process fluid

Check mark

Special Conditions

Check mark

Does the application involve very high or low temperatures?

Check mark

Specify the type of lubrication used for high or low temperature applications

Check mark

Additional Information

Run this procedureArrow right

Initial 100 Hours Viking Reducer Oil Change

Check mark

Oil Type Selection

Check mark

Select the oil type based on temperature conditions

Check mark

Oil Quantity Verification

Check mark

Verify the oil quantity for each Viking reducer size

Check mark

Oil Change Procedure

Check mark

Drain the old oil from the Viking reducer

Check mark

Refill with the new lubricant to the proper level

Check mark

Post Oil Change Check

Check mark

Is the oil filled to the proper level for the selected size?

Run this procedureArrow right

Pump Packing Adjustment

Check mark

Initial Packing Adjustment

Check mark

Ensure initial packing adjustment is made carefully

Check mark

Is the packing gland over-tightened?

Check mark

Post-Adjustment Inspection

Check mark

Does the inspection reveal the need for packing gland adjustment?

Check mark

Does the inspection reveal the need for packing replacement?

Check mark

Further Assistance

Check mark

Contact Viking Pump® representative for Engineering Service Bulletin ESB-521 regarding repacking pump

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets