
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Pump HL1124A
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Relief Valve Adjustment
Pressure Adjustment
Remove valve cap covering the adjusting screw
Loosen locknut on the adjusting screw
Install a pressure gauge in the discharge line
Adjust the pressure setting by turning the adjusting screw
Close the discharge line beyond the pressure gauge
Limit the operation time to prevent rapid temperature rise
Record the maximum pressure shown on the gauge
Tighten the locknut and replace the cap gasket and valve cap
Pump Alignment Check
Check Alignment After Mounting
Ensure pump, drive, and motor were properly aligned during assembly
Recheck alignment after pump unit installation
Check pump ports for proper position
Shim or move the pump as required
Ensure piping is not forced to line up with ports
Flexible Coupling Alignment Check
Remove any coupling guards or covers
Check alignment of coupling halves using a straightedge
Pump Packing Adjustment
Initial Packing Adjustment
Make initial packing adjustments carefully
Ensure packing gland is not over-tightened
Post-Adjustment Inspection
Inspect for leakage control
Determine need for packing gland adjustment or replacement
Contact Viking Pump® representative for Engineering Service Bulletin ESB-521 regarding repacking pump
Pump Cleaning
Initial Cleaning
Wipe down the exterior of the pump to remove surface dirt and grime
Inspect for any visible grease fittings covered in dirt
Detailed Cleaning
Clean around grease fittings to ensure they are free from dirt
Is the pump free from any visible dirt or grease?
Post-Cleaning Inspection
Inspect the pump for any signs of wear or damage
Note any areas that require further inspection or repair
500 Hourly Pump Lubrication
Lubrication of Pump Fittings
Apply multi-purpose grease, NLGI # 2, to all lubrication fittings using a hand gun
Record any lubrication issues or observations
O-Pro™ Seals Lubrication
Grease O-Pro™ seals with a lubricating fluid compatible with the process fluid
Record any issues or observations with O-Pro™ seals lubrication
Additional Considerations
Are there any specific lubrication questions to address with Viking Pump® representative?
Does the application involve very high or low temperatures requiring different lubrication?
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













