The Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 215 - 050L / 050L is a high-efficiency cooling solution designed for industrial applications. Known for its reliability and performance, this chiller optimizes energy use while providing consistent temperature control. Ideal for large facilities, it ensures effective climate management.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 215 - 050L / 050L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Chiller Lubrication
Lubricate the vane control linkage bearings, ball joints, and pivot points
Lubricate vane operator tang O- rings
Lubricate the oil filter shutoff valve O-rings
Sign off on the chiller lubrication
1 Yearly Condenser Cleaning
NOTICE: Proper Water Treatment Required! The use of untreated or improperly treated water could result in scaling, erosion, corrosion, algae or slime. Use the services of a qualified water treatment specialist to determine what water treatment, if any, is required. Trane assumes no responsibility for equipment failures which result from untreated or improperly treated water, or saline or brackish water.
Condenser tube fouling is indicated when the approach temperature (the difference between the condensing refrigerant temperature and the leaving condenser water temperature) is higher than predicted.
If the annual condenser tube inspection indicates that the tubes are fouled, two cleaning methods— mechanical and chemical—can be used to rid the tubes of contaminants. Use the mechanical cleaning method to remove sludge and loose material from smooth-bore tubes.
To clean other types of tubes including internally- enhanced types, consult a qualified service organization for recommendations.
Waterbox covers removed?
Round nylon or brass bristled brush worked in and out of each of the condenser water tubes to loosen the sludge?
Condenser water tubes thoroughly flushed with clean water?
Scale deposits are best removed by chemical means. Be sure to consult any qualified chemical house in the area (one familiar with the local water supply’s chemical mineral content) for a recommended cleaning solution suitable for the job.
NOTICE: Unit Corrosion Damage! Failure to follow instructions below could result in corrosion damage to the unit and tubes. Follow proper procedures when using corrosive chemicals to clean water side of unit. If unsure, it is recommended that the services of a qualified chemical cleaning firm be used.
1 Yearly Compressor/Motor Inspection
- Shut down the chiller once each year to check the items
- Compressor/Motor p.103:
1. Motor continuity
2. Motor meg test
3. Check motor terminals
4. Inspect motor terminal board
5. Check inlet guide vanes (IGV) for abnormalities;
Initial 1 Month Waterbox Maintenance
Trane recommends that coated waterboxes/tubesheets - regardless of the type of protective coating included - be taken out of service within the first one to three months of operation for inspection.
Any voids or defects identified upon inspection?
If voids or defects are identified, they must be repaired.
Is the water quality known to be highly supportive of corrosion (i.e., sea water, etc.)?
If yes, inspect the coating system at one month.
Is the water quality known to be relatively benign (i.e., normal treated and clean condenser water)?
If yes, inspect the coating system within three months.
Did the initial inspections show no problems?
Only when initial inspections show no problems are present should subsequent maintenance intervals be increased.
1 Yearly Evaporator Inspection
- Shut down the chiller once each year to check the items of Evaporator
1. Inspect for fouling and scaling in tubes
2. Check operation of evaporator water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
Access the parts list for your equipment in MaintainX.
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













