

The Toyota Forklift 7FG10 is a reliable and efficient industrial forklift designed for heavy-duty applications. Known for its robust performance and durability, this model is ideal for warehouses and manufacturing environments, ensuring optimal productivity and safety in material handling tasks.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Toyota Forklift 7FG10
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2000 Hour / 12 Month Braking System Maintenance
Inspect function, wear, damage, leak and mounting looseness in Master cylinder and wheel cylinder
Inspect Wear of shoe sliding portion and lining
Inspect Drum wear and damage
Inspect Shoe operating condition
Inspect Anchor pin rusting
Measure Return spring fatigue
Inspect Automatic adjuster function
Inspect Backing plate for deformation, cracks and damage
Retighten Backing plate loose mounting
2000 Hour / 12 Month Engine System Maintenance
Measure Valve clearance (IDZ-II·2Z)
Measure main body compression
Retighten cylinder head bolt loosening
Inspect muffler rubber mount
Measure injection nozzle injection pressure and spray status
Inspect radiator rubber mount
Sign off on the engine system maintenance
2000 Hour / 12 Month Maintenance
Inspect cracks at fork root and welded part while forklift is new
Inspect wear and damage of mast support bushing
Inspect wear and damage of roller pins
Measure relief pressure in oil control valve
Inspect plug cord discontinuity
Inspect damage of power steering hose
Inspect cracks and deformation in knuckle
Sign off on the 2000 Hour / 12 Month Maintenance
500 Hour / 3 Month Maintenance
Retighten loose joint in propeller shaft and axle shaft
Replace engine oil filter
Replace engine coolant
Sign off on the maintenance
2000 Hour / 12 Month Safety Devices Maintenance
Inspect damage and cracks of frame, cross members, etc.
Retighten body bolt looseness
Inspect lock cylinder accumulator performance
Inspect rusting and corrosion of load sensor
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













