Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Toyota Forklift 5FBC13
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
500 Hour / 3 Month Electrical System Inspection
Motor Insulation resistance
Battery Insulation resistance
Operating voltage of the charger
2000 Hour / 12 Month Electrical System Inspection
Measure motor brush spring fatigue
Measure voltage of each battery cell after charging
Inspect magnet switch function, contact fouling and roughening in charger
Inspect installation status of the arc shooter
Inspect magnet contactor's function and timing
Inspect looseness of the coil mounting parts
Inspect mounting condition of the main circuit lead wire, looseness
Measure controller overcurrent limit valve
Sign off on the electrical system inspection
170 Hour / 1 Month Travelling Equipment System Maintenance
Inspect wheels for tire cuts, damage and uneven wearing
Retighten loose rim and hub nuts in wheels
Measure tire groove depth in wheels
Inspect metal chips, pebbles and other foreign matter trapped in tire grooves
Inspect rim and disc wheel damage
Inspect abnormal sound and looseness of front wheel bearing
Inspect abnormal sound and looseness of rear wheel bearing
Sign off on the travelling equipment system maintenance
2000 Hour / 12 Month Replacement
Differential oil replaced
Transmission oil replaced
Wheel bearing grease replaced
Master cylinder rubber parts replaced
Wheel cylinder rubber parts replaced
Sign off on the replacement procedure
2 Year Replacement
Power steering hoses replaced
Internal rubbers parts of power steering system replaced
Reserve tank hose replaced
Material handling hose replaced
Note: Replace chain every 3 years
Sign off on the 2 Year Replacement
Access the parts list for your equipment in MaintainX.
Universal Joint Flange Holding Tool
09330-30010
Rear Wheel Bearing Nut Wrench
09509-55020
Front Hub & Drive Pinion Bearing Tool Set
09608-30012
Axle Hub & Drive Pinion Bearing Tool Set
09608-35014
Steering Wheel Puller
09609-20011
Universal Joint Flange Holding Tool
09330-30010
Rear Wheel Bearing Nut Wrench
09509-55020
Front Hub & Drive Pinion Bearing Tool Set
09608-30012
Axle Hub & Drive Pinion Bearing Tool Set
09608-35014
Steering Wheel Puller
09609-20011
Universal Joint Flange Holding Tool
09330-30010
Rear Wheel Bearing Nut Wrench
09509-55020
Front Hub & Drive Pinion Bearing Tool Set
09608-30012
Axle Hub & Drive Pinion Bearing Tool Set
09608-35014
Steering Wheel Puller
09609-20011
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX