MaintainX Asset Hub logo
EnterprisePricing
PVI Industries

PVI Industries Water Heater 50L 255A PVX

Need answers fast?
Explore the manual using AI.

PVI Industries Water Heater 50L 255A PVX
PVI Industries Water Heater 50L 255A PVX

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for PVI Industries Water Heater 50L 255A PVX

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

PVI Industries Water Heater 50L 255A PVX

PVI Industries Water Heater 50L 255A PVX

Create an account to install this asset package.

Maintenance Plans for PVI Industries Water Heater Model 50L 255A PVX

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Water Heater Testing

Check mark

Low-water-cut-off Testing

Check mark

Test Low-water-cut-off (if equipped)

Check mark

Reset Low-water-cut-off

Check mark

Electronic-ignition Flame Failure Detection System Testing

Check mark

Test the electronic-ignition flame failure detection system

Check mark

Reset the electronic-ignition flame failure detection system

Run this procedureArrow right

1 Monthly Water Heater Maintenance

Check mark

Condensate Drain System Maintenance

Check mark

Check condensate drain system

Check mark

Refill the condensate neutralizer with limestone

Check mark

Visually inspect venting system for proper function, deterioration or leakage

Check mark

Low-Water Cutoff and Alarm Check

Check mark

Confirm the low-water cutoff is operating

Check mark

Confirm the alarm is operating

Run this procedureArrow right

1 Yearly Water Heater Check

Check mark

WARNING: Use exact, Factory authorized, replacement parts

Check mark

Label all wires prior to disconnection

Check mark

Verify proper operation after servicing

Check mark

Examine the appliance and venting system

Check mark

Have the entire system inspected by a qualified service agency

Run this procedureArrow right

1 Daily Water Heater Check

Check mark

Obstruction and Safety Check

Check mark

Remove any obstruction to the flow of combustion or ventilation air to the unit

Check mark

Ensure area is free from combustible materials

Check mark

Gauges and Indicators Check

Check mark

Check gauges, monitors, and indicators

Run this procedureArrow right

Water Heater Maintenance

Check mark

WARNING

Check mark

Document any wiring changes or disconnections

Check mark

Inspect for dusty or dirty combustion air

Check mark

Is there any sign of soot on the heat exchanger or in the flue?

Check mark

Heat Exchanger Inspection and Cleaning

Check mark

Turn off main power to unit

Check mark

Turn off gas supply

Check mark

Document the disassembly process

Check mark

Disconnect electrical components

Run this procedureArrow right

Parts for PVI Industries Water Heater 50L 255A PVX

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Tab,Burner Grounding

128315

Gasket,Flange Burner 1/8 232 Craneglas 5.750 Id

126509

Gasket, Ignitor 1/8 232 Craneglas Y271

111791

Igniter, Hot Surface Norton #271Y Mb478843

107774

Nut, Wing 1/4 X 20 Nc Steel Zinc Plt

3475

Tab,Burner Grounding

128315

Gasket,Flange Burner 1/8 232 Craneglas 5.750 Id

126509

Gasket, Ignitor 1/8 232 Craneglas Y271

111791

Igniter, Hot Surface Norton #271Y Mb478843

107774

Nut, Wing 1/4 X 20 Nc Steel Zinc Plt

3475

Tab,Burner Grounding

128315

Gasket,Flange Burner 1/8 232 Craneglas 5.750 Id

126509

Gasket, Ignitor 1/8 232 Craneglas Y271

111791

Igniter, Hot Surface Norton #271Y Mb478843

107774

Nut, Wing 1/4 X 20 Nc Steel Zinc Plt

3475

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from PVI Industries

Explore Other Assets