MaintainX Asset Hub logo
EnterprisePricing
Porter International

Porter International Flange Machine PFM-1000

Need answers fast?
Explore the manual using AI.

Porter International Flange Machine PFM-1000
Porter International Flange Machine PFM-1000

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Porter International Flange Machine PFM-1000

Porter International Flange Machine PFM-1000

Create an account to install this asset package.

Maintenance Plans for Porter International Flange Machine Model PFM-1000

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Flange Machine Maintenance

Check mark

Before morning start

Check mark

• Make sure oil level is correctly maintained in oil sight gauge.

Check mark

• Make sure needle is correctly set and not damaged.

Check mark

• Make sure threading is correct.

Check mark

• Make sure chaining thread approximately 10 mm long remains behind presser foot.

Check mark

At close of work

Check mark

Remove dust and lint deposited in the machine around needle plate and looper.

Check mark

• If any trouble or irregularity is found.1 report it to the plant mechanic for adjustment or repair.

Check mark

• Keep record of needle and thread breakage.;

Run this procedureArrow right

3 Monthly Oil Filter Maintenance

Check mark

Warning: Ensure the machine is turned off and disconnected from power source before starting the maintenance.

Check mark

Check if oil jet in oil sight window (1) is restricted or weak, or oil contains foam or debris.

Check mark

If the oil jet is restricted or weak, or the oil contains foam or debris, proceed with the following steps.

Check mark

Drain oil from machine.

Check mark

Remove bolts (5) and oil pan from machine.

Check mark

Remove screws 6 and take out filter (4).

Check mark

Clean filter (4) with new petrol and blow it with low pressure air.

Check mark

Replace filter (4) and tighten screws (6).

Check mark

Replace oil pan and tighten bolts (5).

Run this procedureArrow right

6 Monthly Oil Change

Check mark

TO DRAIN OIL:

Check mark

Remove the machine from its stand and set it on a table

Check mark

Screw out drain plug (3) and drain oil

Check mark

Replace drain plug (3)

Run this procedureArrow right

Chainstitch Looper Adjustment

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Slide chainstitch looper into lever 5, making sure it reaches regulator 2

Check mark

If necessary, adjust this by turning regulator 2

Check mark

Turn handwheel by hand until needle bar ascends 3.0 mm from the lowest position.

Check mark

Move lever 6 so that looper point comes to the scarf of left needle and just touches needle (the clearance 0 - 0.1 mm).

Check mark

Turn handwheel until looper is at its extreme left position.

Check mark

Adjust the distance from the centerline of left needle to point of looper to 1.5 to 2 mm.

Check mark

Tighten screw 4 securely.

Check mark

Sign off on the chainstitch looper adjustment

Run this procedureArrow right

Chainstitch Looper Thread Control Adjustment

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Screw 6 lightly loosened

Check mark

Bracket 6 set horizontal and guide set as 0.5 mm above from the top of bracket 6

Check mark

Screw 6 tightened

Check mark

Two screws for takeup 8 loosened and handwheel turned until chainstitch looper is at extreme right position

Check mark

Takeup set so that its flat portion is at a 10 degrees angle to guide 7

Check mark

Two screws tightened

Check mark

Screws holding eyelets 9 loosened and eyelets 9 moved until the coiled ends line up with engraved line (A) on bracket

Check mark

Screws tightened

Run this procedureArrow right

Parts for Porter International Flange Machine PFM-1000

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

3/4" Top Feed

660007

Acorn Nut

630300

Adaptor

630301

Adaptor

660034

Adaptor, Hinge-1' Model Only

660047

3/4" Top Feed

660007

Acorn Nut

630300

Adaptor

630301

Adaptor

660034

Adaptor, Hinge-1' Model Only

660047

3/4" Top Feed

660007

Acorn Nut

630300

Adaptor

630301

Adaptor

660034

Adaptor, Hinge-1' Model Only

660047

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Porter International

Explore Other Assets