MaintainX Asset Hub logo
EnterprisePricing
KUKA

KUKA Robot Controller KR C4 CK NA

Need answers fast?
Explore the manual using AI.

KUKA Robot Controller KR C4 CK NA
KUKA Robot Controller KR C4 CK NA

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

KUKA Robot Controller KR C4 CK NA

KUKA Robot Controller KR C4 CK NA

Create an account to install this asset package.

Maintenance Plans for KUKA Robot Controller Model KR C4 CK NA

Integrate maintenance plans directly into your work orders in MaintainX.

2 Yearly Robot Controller Cleaning

Check mark

NOTE: Maintenance work must be performed at the specified maintenance intervals after commissioning at the customer’s plant

Check mark

1. Depending on installation conditions and degree of fouling, clean the heat exchanger with a brush

Check mark

2. Depending on installation conditions and degree of fouling, clean the internal fans with a brush

Check mark

3. Depending on installation conditions and degree of fouling, clean the heat sinks of the KPP, KSP and low-voltage power supply unit with a brush

Check mark

4. Depending on installation conditions and degree of fouling, clean the external fans with a brush;

Run this procedureArrow right

5 Yearly Control PC Fan Replacement

Check mark

Precondition: The robot controller must be switched off and secured to prevent unauthorized persons from switching it on again. The power cable is de-energized. Observe the ESD guidelines. WARNING: Cables routed from power supply connection X1 to the main switch are energized even when the main switch is switched off! This mains voltage can cause life-threatening injuries on contact.

Check mark

Control PC removed

Check mark

Air duct removed

Check mark

Cover of the control PC removed

Check mark

Fan connector released and unplugged

Check mark

Outer fan grille removed

Check mark

Fan pulled inwards off the mounting plugs

Check mark

Expanding rivets removed and fan grille taken off

Check mark

Fan grille fastened to the new fan with the expanding rivets

Run this procedureArrow right

5 Yearly External Fan Replacement

Check mark

NOTE: Maintenance work must be performed at the specified maintenance intervals after commissioning at the customer’s plant

Check mark

Precondition: The robot controller must be switched off and secured to prevent unauthorized persons from switching it on again

Check mark

The power cable is de-energized

Check mark

Observe the ESD guidelines

Check mark

WARNING: Cables routed from power supply connection X1 to the main switch are energized even when the main switch is switched off! This mains voltage can cause life-threatening injuries on contact

Check mark

Unplug fan connector X14 on the CCU

Check mark

Remove the rear panel

Check mark

Remove the screws of the cable inlet

Check mark

Swivel back the cable inlet and pull out the connecting cable

Run this procedureArrow right

5 Yearly Internal Fan Replacement

Check mark

Precondition: The robot controller must be switched off and secured to prevent unauthorized persons from switching it on again. The power cable is de-energized. Observe the ESD guidelines.

Check mark

WARNING: Cables routed from power supply connection X1 to the main switch are energized even when the main switch is switched off! This mains voltage can cause life-threatening injuries on contact.

Check mark

Robot controller switched off and secured?

Check mark

Power cable de-energized?

Check mark

ESD guidelines observed?

Check mark

Cables from power supply connection X1 to the main switch de-energized?

Check mark

Screws from the fan holder removed?

Check mark

Internal fan pulled out of the tab complete with the holder?

Check mark

Connector of internal fan unplugged?

Run this procedureArrow right

6 Monthly Relay Output Check

Check mark

NOTE: Maintenance work must be performed at the specified maintenance intervals after commissioning at the customer’s plant

Check mark

- SIB relay outputs check!

Check mark

Activity - Check the function of the output “Local Emergency Stop”

Check mark

1.Press the local EMERGENCY STOP device. Activity - Check the function of the output “Operator safety acknowledged”

Check mark

1. Set operating mode to Automatic or Automatic External

Check mark

2. Open operator safety (safeguard)

Check mark

Activity - Check the function of the output “Switch on periphery”!

Check mark

1. Set operating mode to Automatic or Automatic External

Check mark

2. Open operator safety (safeguard)

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from KUKA

Explore Other Assets