MaintainX Asset Hub logo
EnterprisePricing
Porter International

Porter International Box Spring Machine CB-100

Need answers fast?
Explore the manual using AI.

Porter International Box Spring Machine CB-100
Porter International Box Spring Machine CB-100

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Porter International Box Spring Machine CB-100

Porter International Box Spring Machine CB-100

Create an account to install this asset package.

Maintenance Plans for Porter International Box Spring Machine Model CB-100

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Box Spring Machine Maintenance

Check mark

Before morning start

Check mark

. Make sure oil level is correctly maintained in oil sight gauge.

Check mark

. Make sure needle is correctly set and not damaged.

Check mark

. Make sure threading is correct.

Check mark

· Make sure chaining thread approximately

Check mark

10 mm long remains behind presser foot.

Check mark

Chaining Thread

Check mark

It is necessary to have a chaining thread approximately 10 mm long behind the presser foot when starting to sew. This will avoid "skip-stitches."

Check mark

After replacing needles or thread, check that a continuous, smooth neat chaining thread comes out from under the presser foot.

Run this procedureArrow right

4 Weekly Box Spring Machine Lubrication

Check mark

Lubrication is important in operating precision machines like the BS 401. The life of the machine depends on the use of quality oil. Use only oil recommended for these machines as shown at right.

Check mark

1. At the end of 4 weeks, the original oil should be drained and replaced

Check mark

2. Oil level should always be kept between two lines on the oil sight gauge (as shown in Fig.3 below).

Check mark

To Fill Oil:

Check mark

1 Remove oil sight window 1 and pour fresh oil into reservoir (700 c.c. capacity) until oil reaches upper line of oil sight gauge @

Check mark

2. Replace window 1.

Check mark

Caution: Keep oil level between the two lines on gauge 2.

Check mark

To Drain Oil:

Check mark

1 .Remove the machine from its stand and set it on a table.

Run this procedureArrow right

Air Pressure Settings Adjustment

Check mark

A. Main air gauge.

Check mark

1. Flip up "hemmer" toggle switch.

Check mark

2. Adjust main air knob to obtain 80-100 PSI of air pressure.

Check mark

3. Tighten center screw on knob to lock the knob at this position.

Check mark

B. Binder hemmer gauge

Check mark

1. Flip up "binder" toggle switch.

Check mark

2. Adjust knob and tighten screw to obtain 30 PSI of air pressure as described below.

Check mark

C."A, B, C" gauges (These gauges control the air pressure on the drag foot. The three switches toggle three different types of material.)

Check mark

1. Flip up respective toggle switches.

Run this procedureArrow right

Feed Height Adjustment

Check mark

Warning: Ensure the machine is turned off and unplugged before starting the procedure.

Check mark

Is the main feed at the standard height?

Check mark

If not, follow the steps below.

Check mark

Loosen screw 2.

Check mark

Adjust feed 1 by raising or lowering until proper height is obtained.

Check mark

Tighten screw 2.

Check mark

Sign off on the feed height adjustment

Run this procedureArrow right

Feed Tilt Adjustment

Check mark

Warning: This procedure requires trained personnel!

Check mark

Feeds are at their highest position

Check mark

Screws 6 and cover plate 7 removed

Check mark

Screw 8 loosened

Check mark

Screw 9 removed and screw 10 turned for proper tilt

Check mark

Screw 8 tightened and play in feed bars eliminated

Check mark

Cover plate 7 and screws 6 replaced

Check mark

Screw 9 replaced

Check mark

Sign off on the feed tilt adjustment

Run this procedureArrow right

Parts for Porter International Box Spring Machine CB-100

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Adjusting Screw

6219

Air Cylinder

SMA-2

Air Cylinder

020.5-DXP

Air Fitting

MH-1016

Air Flow Valve

MNV-1KP

Adjusting Screw

6219

Air Cylinder

SMA-2

Air Cylinder

020.5-DXP

Air Fitting

MH-1016

Air Flow Valve

MNV-1KP

Adjusting Screw

6219

Air Cylinder

SMA-2

Air Cylinder

020.5-DXP

Air Fitting

MH-1016

Air Flow Valve

MNV-1KP

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Porter International

Explore Other Assets