

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Nordson Powder Coating System COLORMAX
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Daily Bulk Feed Transfer Pump Maintenance
Disconnect the transfer hoses from the pumps
Blow out the powder from the hoses with compressed air
Remove the transfer pumps from the adapters
Blow out the adapters and pickup tubes
Disassemble the pumps
Clean the parts with a low-pressure air gun and a clean cloth
Replace any worn or damaged parts
Sign off on the daily bulk feed transfer pump maintenance
1 Daily Cartridge Filters and Housings Check
Pulse the cartridge filters
Cartridge filter differential pressure gauge reading
Check the pulse valve timing
Sign off on the cartridge filters and housings check
1 Daily Compressed Air Supply Maintenance
Hold a clean, white cloth under the supply line drop leg and open the drop-leg drain valve
Water, oil, or other contaminants will stain the cloth
Eliminate any source of contamination
Drain the filters and separators and check the filter elements
Check all air pressure regulator settings
NOTE: The air dryer should remain on at all times to prevent moisture from accumulating in the compressed air system;
1 Daily Flame Detector System Check
Check the detector sensors every four hours and clean the lenses, if necessary
Make sure air is being supplied to the sensors
Make sure the detector system is operating properly
1 Daily Powder Coating System Maintenance
- Air Dryers
1. Perform any required maintenance as described in your air dryer manual
- Air Velocity
1. Measure the air velocity at all booth openings with a velometer. Minimum velocity is 36 m/min (120 fpm)
- Final Filter Housing and Fan
1. With the exhaust fan operating, check the final filter differential pressure gauge. It should read between 1- and 2.5-in. wc
- Powder Spray Guns
1. Clean the spray guns according to the instructions in their manuals;
Access the parts list for your equipment in MaintainX.
Baffle, Plate Assembly
1008295
Black or Silver Turbo Pulse Valves Diaphragm Kit
1041192
Bracket, Filter Centering
174722
Bracket, Nozzle Positioning, Gun Blow-off
1014478
Cyclone Cleaning Media, 50 lb Drum
1018784
Baffle, Plate Assembly
1008295
Black or Silver Turbo Pulse Valves Diaphragm Kit
1041192
Bracket, Filter Centering
174722
Bracket, Nozzle Positioning, Gun Blow-off
1014478
Cyclone Cleaning Media, 50 lb Drum
1018784
Baffle, Plate Assembly
1008295
Black or Silver Turbo Pulse Valves Diaphragm Kit
1041192
Bracket, Filter Centering
174722
Bracket, Nozzle Positioning, Gun Blow-off
1014478
Cyclone Cleaning Media, 50 lb Drum
1018784
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













